The Osterberg Cell

The Osterberg Cell

HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close proximity to the City Hall. The outcome of the load test was to determine the actual soil parameters for the foundation pile design on the project.

The O-cell is a hydraulically driven, high capacity, sacrificial loading device installed within the foundation unit. As the load is applied to the O cell, it begins working in two directions; upward against upper side shear and downward against base resistance and lower side shear (if applicable). Each O-cell is specially instrumented to allow for direct measurement of the O-cell’s expansion. O-cells range in capacities from 800 kN to 26,000 kN.

The scope of work consisted in installation of single test pile (1070mm diam. x 8.0 meters top liner casing, 910mm diam. x 8.0 meters rock socket). The overall length of test pile was approx.16 meters. O-cell was attached to the bottom of the steel frame c/w instrumentation connections, gauges, wiring etc.

Steel frame was manufactured in HCM’s shop, the O-cell was supplied by Loadtest Inc. HCM installed the pile in one day according to the timeline and specification requirements.

Client: Tetra Tech EBA

Location: Calgary, Alberta

HC Matcon - Twinning of the West Trunk Sanitary Sewer

Twinning of the West Trunk Sanitary Sewer

Twinning Of The West Trunk Sanitary Sewer This project includes the installation of a deep trunk sanitary sewer within bedrock under Erin Mills Parkway in Mississauga. HCM together with RWH Engineering
Read More
Centre 10

Centre 10

Centre 10 Two attempts had been made by others to build two high-rise condo towers on the site of the former Gaslight Square retail strip at 10th Ave and 4th
Read More
Bluwater Condominiums

Bluwater Condominiums

The Pemberton Group is adding the luxury waterfront Bluwater Condominiums to its portfolio. The 22,000 SF area of shoring area will accommodate the construction of three eight-story buildings on the
Read More
CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms.
Read More
London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and
Read More
Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More