Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2

HC Matcon’s project at the Siemens Energy Blade Plant consisted of the design, supply & installation of 70 helical piers within the existing plant location in Tillsonburg, ON.

As the project was located in an existing, active manufacturing facility, extra care had to be taken on the part of HC Matcon to work within the confines of the building space, which included tight egress for our equipment and limited head room clearance (20′+/-).

Safety is always a number one priority, but additional attention had to be paid as the work was being completed within an active plant with live personnel maintaining scheduled productions.

Some unforeseen obstructions were encountered during helical installation, but with quick decision making and our crews efficiency, HC Matcon was able to complete the project on time and on budget.

Client: Grassmere Construction
Location: Tillsonburg, Ontario

The Bow

The Bow

The future Bow building, located in Calgary, Alberta Canada, is an innovation in both architectural and shoring design. At 58 stories and with a footprint of two city blocks, The
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

Sage Condominiums: Phase II The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering
Read More
Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More
Mill Pond Estates

Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg. The project was completed during winter months with
Read More

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More