Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2

HC Matcon’s project at the Siemens Energy Blade Plant consisted of the design, supply & installation of 70 helical piers within the existing plant location in Tillsonburg, ON.

As the project was located in an existing, active manufacturing facility, extra care had to be taken on the part of HC Matcon to work within the confines of the building space, which included tight egress for our equipment and limited head room clearance (20′+/-).

Safety is always a number one priority, but additional attention had to be paid as the work was being completed within an active plant with live personnel maintaining scheduled productions.

Some unforeseen obstructions were encountered during helical installation, but with quick decision making and our crews efficiency, HC Matcon was able to complete the project on time and on budget.

Client: Grassmere Construction
Location: Tillsonburg, Ontario

Twinning Tunnels

Twinning Tunnels The installation of a deep trunk sanitary sewer system in the bedrock beneath Erin Mills Parkway in Mississauga required an innovative approach for shoring manholes. For this project,
Read More
London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and
Read More

University of Toronto Faculty of Law

TTC Steels Launch Shaft The expansion of the Faculty of Law building at the University of Toronto incorporated the addition of another storey to the existing building. The increased loading
Read More
The Bow

The Bow

The future Bow building, located in Calgary, Alberta Canada, is an innovation in both architectural and shoring design. At 58 stories and with a footprint of two city blocks, The
Read More

8 Ida Street

8 Ida Street HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More