TTC Wilson Complex Modification

Engineering Solutions

The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson wall, soldier piles and lagging, and conventional concrete underpinning for the earthwork specifications related to our field of work. HC Matcon proposed an alternative engineered solution that included the use of shotcrete, underpinning, micropiles, soldier piles and shotcrete lagging (SPSL) to achieve the same effect. The acceptance of this proposal allowed for a substantial cost savings to the owner, as well as a shorter construction schedule for the various contractors involved. Mechanical jacking pits were built where shoring is used as a backform for manholes. Shoring for carhouses below- grade will be used as a backform for foundation walls. The substitution of shotcrete underpinning in lieu of caisson walls will allow for easier access to the tunnel portion of the project. This will allow for less demolition of the existing building and less clearance issues.

The above are just a couple examples of the innovations that HCM Contractors Inc. will use to add value to any project.

Client: Aquicon Construction
Location: Toronto, Ontario

Credit Valley Hospital

Credit Valley Hospital

Alternative to Save Time and Money The Credit Valley Hospital in Mississauga, Ontario is undergoing a massive expansion and renovation. HC Matcon was brought in to undertake the shoring, underpinning,
Read More
Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More
Telus Sky tower - HC Matcon

Telus Sky tower

Telus Sky tower The Telus Sky tower will be the 3rd tallest building in Calgary with the deepest basement excavation in western Canada. HCM Group took on the challenge of
Read More
Mill Pond Estates

Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg. The project was completed during winter months with
Read More
HCM Group - K2 Condominiums

K2 Condominiums

K2 Condominiums This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging
Read More

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at
Read More