Centron Business Park Retaining Wall

Steep Slope Retaining Wall

The site topography presented the developer with the challenging task of constructing a permanent retaining wall structure into a hill formation near Blackfoot Trail in southeast Calgary, Alberta. The purpose of the permanent wall was to support a portion of 4th Street S.E. which is serving as an access road to a multi-building complex for commercial real estate. The retaining wall was designed by EBA Engineering Consultants Ltd. as a Cantilever Tangent Wall with various excavation depths, c/w embedment of soldier piles between 7.5m and 14.5m below-grade. The length of shoring wall was 142 linear metres with a total of 470 square metres of exposed surface area. The pile sizes included diameters of 810mm and 912mm. The overall scope of work consisted of drilling approximately 70 soldier piles and 140 filler piles. The client also accepted HCM’s proposal to trim the front surface of the 10 MPa concrete wall which then became more suitable for future application of architectural cladding or finished shotcrete. HCM completed this task with an excavator-mounted Antraquip wall trimmer.

The design also required precision in the placing of the piles along the contour of a curvilinear access road which, in most cases, took place on the edge of a steep slope.

HCM Contractors successfully completed this project to the engineer’s satisfaction, and on schedule.

Client: Centron Group of Companies
Location: Calgary, Alberta

Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More
Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More
Segmental Excavation Mining and Support of Excavation - Eglinton LRT - Cedarvale Station SEM and SOE

Eglinton LRT – Cedarvale Station SEM and SOE

Eglinton LRT – Cedarvale Station SEM and SOE The Eglinton LRT Cedarvale Station required the new structure to pass below the existing TTC subway below grade. HC Matcon Inc. (HCM)
Read More

Herald Block

Herald Block HCM was chosen to provide a comprehensive design-build shoring solution for Phase 1 of Brookfield Place development, which will become the tallest building in Western Canada. The excavation
Read More

Midtown Lofts

Midtown Lofts On this project, HCM in conjunction with RWH Engineering Inc. (RWH), provided the owner with a complete design-build package and precision monitoring services for an 8.5m deep temporary
Read More
Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More