TTC Wilson Complex Modification

Engineering Solutions

The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson wall, soldier piles and lagging, and conventional concrete underpinning for the earthwork specifications related to our field of work. HC Matcon proposed an alternative engineered solution that included the use of shotcrete, underpinning, micropiles, soldier piles and shotcrete lagging (SPSL) to achieve the same effect. The acceptance of this proposal allowed for a substantial cost savings to the owner, as well as a shorter construction schedule for the various contractors involved. Mechanical jacking pits were built where shoring is used as a backform for manholes. Shoring for carhouses below- grade will be used as a backform for foundation walls. The substitution of shotcrete underpinning in lieu of caisson walls will allow for easier access to the tunnel portion of the project. This will allow for less demolition of the existing building and less clearance issues.

The above are just a couple examples of the innovations that HCM Contractors Inc. will use to add value to any project.

Client: Aquicon Construction
Location: Toronto, Ontario

University of Toronto Faculty of Law

TTC Steels Launch Shaft The expansion of the Faculty of Law building at the University of Toronto incorporated the addition of another storey to the existing building. The increased loading
Read More
London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and
Read More
Mars B Toronto General Hospital

Mars B Toronto General Hospital

This 3.5 Million dollar contract involved HC Matcon providing a full excavation, a 16,000 Sq. Ft. shoring and large diameter caisson package for this project. Challenges included the support of
Read More

Twinning Tunnels

Twinning Tunnels The installation of a deep trunk sanitary sewer system in the bedrock beneath Erin Mills Parkway in Mississauga required an innovative approach for shoring manholes. For this project,
Read More
Niagara Biosolids Facility - Inside Pit

Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included:
Read More