TTC Wilson Complex Modification

Engineering Solutions

The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson wall, soldier piles and lagging, and conventional concrete underpinning for the earthwork specifications related to our field of work. HC Matcon proposed an alternative engineered solution that included the use of shotcrete, underpinning, micropiles, soldier piles and shotcrete lagging (SPSL) to achieve the same effect. The acceptance of this proposal allowed for a substantial cost savings to the owner, as well as a shorter construction schedule for the various contractors involved. Mechanical jacking pits were built where shoring is used as a backform for manholes. Shoring for carhouses below- grade will be used as a backform for foundation walls. The substitution of shotcrete underpinning in lieu of caisson walls will allow for easier access to the tunnel portion of the project. This will allow for less demolition of the existing building and less clearance issues.

The above are just a couple examples of the innovations that HCM Contractors Inc. will use to add value to any project.

Client: Aquicon Construction
Location: Toronto, Ontario

The Osterberg Cell

The Osterberg Cell HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close
Read More
LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall HC Matcon (HCM) and RWH Engineering (RWH) reacted quickly after being contacted to provide a design-build solution for a slope failure that occurred during
Read More
London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and
Read More

Alloa Feedermain

Alloa Feedermain This project involved installation of 3 watertight caisson wall shafts. Two rectangular secant pile wall shaft approx 12m deep and one 6m diameter compression ring shaft approx 7m
Read More
Niagara Biosolids Facility - Inside Pit

Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More