BRT Tomken Station

BRT Tomken Station

The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive.

HCM’s scope of work for this project included all shoring and caisson work to accomodate the construction of transit stations, bridge underpasses and overpasses, and below grade roadways. HCM’s tender submission used shotcrete for roadway protection systems and two-sided shoring for bridge underpass/overpass construction. This unique design, completed by RWH Engineering Inc. (RWH), an HC Group company, resulted in many cost and schedule savings for the owner.

There were numerous jobsites that HCM coordinated during different stages of the project schedule which made communication between the HCM team, the GC and other sub trades critical. This project exemplifies the ability of HCM to assist owners and GCs in finding beneficial solutions for all parties.

Client: Metrolinx

Location: Mississauga, Ontario

The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included:
Read More

University of Toronto Faculty of Law

TTC Steels Launch Shaft The expansion of the Faculty of Law building at the University of Toronto incorporated the addition of another storey to the existing building. The increased loading
Read More

Oshawa Mall

Oshawa Mall The Oshawa Mall expansion was a large project that required several foundation and shoring services. HCM met the needs of the contractor by providing both tied back and
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More
Mill Pond Estates

Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg. The project was completed during winter months with
Read More