The Government of Alberta and Alberta Health Services (AHS) have broken ground on this project, which will renovate and expand the hospital to improve patient services and reduce wait times. When complete, the $200-million redevelopment will expand available ambulatory care space and will allow more space for the emergency department, surgical suite, maternal/child care, and include a rooftop helipad.

HCM Contractors Inc. was successful with its’ proposal that included 100 Belled Caissons at depths up to 100 feet, 7000 ft2 of caisson wall, and the underpinning of 7 major columns to support the additional load imposed by the new structure. The underpinning is particularly challenging because much of the work is to be completed inside of an operational hospital with limited access and noise and vibration concerns. HCM employed a unique method of transferring the load from the column footings to the micro piles that ensured a good bond and efficient design.

This project comes on the heels of the newly constructed MHRH Energy Centre, another successfully completed project by HCM in the fall of 2012.

Client: Stuart Olson Dominion Ltd.
Location: Medicine Hat, Alberta

Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included:
Read More
Mount Royal University Conservatory

Mount Royal University Conservatory

Mount Royal University Conservatory Design considerations for the foundations were similar to previous projects in the area, with installation of approx. 220 cast-in-place belled piles. The project design team for
Read More
Wal-Mart Micropiles

Wal-Mart Micropiles

Overcoming Poorly Engineered Fill This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill. The previous winter
Read More
Weston Tunnel Grade Separation

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation HC Matcon achieved a significant milestone on the Weston Tunnel project, allowing for the GC to accelerate the schedule and make up for project delays. HCM
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More

Weston Road

Weston Road The Metrolinx Weston Tunnel project will serve as a below grade rail corridor for the GO Georgetown line linking the airport to downtown Toronto. HCM was subcontracted by
Read More