The Government of Alberta and Alberta Health Services (AHS) have broken ground on this project, which will renovate and expand the hospital to improve patient services and reduce wait times. When complete, the $200-million redevelopment will expand available ambulatory care space and will allow more space for the emergency department, surgical suite, maternal/child care, and include a rooftop helipad.

HCM Contractors Inc. was successful with its’ proposal that included 100 Belled Caissons at depths up to 100 feet, 7000 ft2 of caisson wall, and the underpinning of 7 major columns to support the additional load imposed by the new structure. The underpinning is particularly challenging because much of the work is to be completed inside of an operational hospital with limited access and noise and vibration concerns. HCM employed a unique method of transferring the load from the column footings to the micro piles that ensured a good bond and efficient design.

This project comes on the heels of the newly constructed MHRH Energy Centre, another successfully completed project by HCM in the fall of 2012.

Client: Stuart Olson Dominion Ltd.
Location: Medicine Hat, Alberta

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation HC Matcon achieved a significant milestone on the Weston Tunnel project, allowing for the GC to accelerate the schedule and make up for project delays. HCM
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
Milton Grade Separation

Milton Grade Separation

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario
Read More
HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

Sage Condominiums: Phase II The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering
Read More
Wal-Mart Micropiles

Wal-Mart Micropiles

Overcoming Poorly Engineered Fill This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill. The previous winter
Read More
St. Thomas Courthouse

St. Thomas Courthouse

Alternate Methods Stop Running Sands HCM was retained to design, supply and install a complete shoring system to facilitate construction of the new St. Thomas Court House for EllisDon. Construction