Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion

The Government of Alberta and Alberta Health Services (AHS) have broken ground on this project, which will renovate and expand the hospital to improve patient services and reduce wait times. When complete, the $200-million redevelopment will expand available ambulatory care space and will allow more space for the emergency department, surgical suite, maternal/child care, and include a rooftop helipad.

HCM Contractors Inc. was successful with its’ proposal that included 100 Belled Caissons at depths up to 100 feet, 7000 ft2 of caisson wall, and the underpinning of 7 major columns to support the additional load imposed by the new structure. The underpinning is particularly challenging because much of the work is to be completed inside of an operational hospital with limited access and noise and vibration concerns. HCM employed a unique method of transferring the load from the column footings to the micro piles that ensured a good bond and efficient design.

This project comes on the heels of the newly constructed MHRH Energy Centre, another successfully completed project by HCM in the fall of 2012.

Client: Stuart Olson Dominion Ltd.
Location: Medicine Hat, Alberta

St. Joseph's Healthcare Redevelopment Project

St. Joseph’s Healthcare Redevelopment Project

Unique Soil Conditions The future location for this tower is located immediately adjacent to the emergency wing of the existing St. Joseph’s hospital in Hamilton, Ontario. HCM is a recognized
Read More
Grand House

Grand House

Difficult But Not Impossible The Grand House is a student designed and constructed co-operative housing project located in Cambridge, Ontario.  It has won awards and is a landmark building. Due
Read More
LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall HC Matcon (HCM) and RWH Engineering (RWH) reacted quickly after being contacted to provide a design-build solution for a slope failure that occurred during
Read More

144 Park Street

144 Park Street During the bidding process, HCM proposed an innovative design-build shoring solution for the 144 Park Street project, a 19 storey condominium in the downtown core of Waterloo.
Read More
The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More

Dufferin Jog Elimination

Dufferin Jog Elimination This project involved the extension of Duffering Street under an existing CN rail line and through the abutment wall of a century old CN bridge at Queen
Read More