Smith Residence

Toronto’s First Permanent Soil Nail Wall

This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in Toronto.

  • Micro piles were used to support a cantilever canopy on one level and HC Matcon completed the full excavation, shoring and footings as a package to the owner.
  • The shoring design called for over sized MAI bars due to low corrosive soil, and a 100 year plus life is expected.
  • The house construction is wood framed which was a lower cost than steel/concrete in that hillside loads over time are taken by the shoring system, which is 150 mm from the house walls.
  • The advantages of shotcrete shoring include smaller equipment to access and do the nails, as typical shoring solution involved large equipment and high costs to build working berms on a hillside lot.

Owners of land that was typically considered unsuitable as building lots can re consider and realize hidden value with permanent soil nail walls constructed by HC Matcon. HCM is a full service Design Build Specialist contractor.

Client: HC Matcon
Location: Toronto, Ontario

St. Joseph's Health Centre Parking

St. Joseph’s Health Centre Parking

Shotcrete Reduces Costs for Owner The St. Joseph’s Health Centre is adding a new Our Lady of Mercy wing complete with three levels of underground parking. HC Matcon was responsible
Read More
LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall HC Matcon (HCM) and RWH Engineering (RWH) reacted quickly after being contacted to provide a design-build solution for a slope failure that occurred during
Read More

Parkside Dr. Slope Stabilization

Parkside Dr. Slope Stabilization The City of Toronto tendered a slope stabilization project that required the installation of helical piles in the embankment of a failed slope on Parkside Drive
Read More
Great Lakes Copper Plant

Great Lakes Copper Plant

Great Lakes Copper Plant The Great Lakes Copper Plant in London, Ontario, posed a technical challenge in shotcrete shoring. HC Matcon helped to facilitate the installation of a new copper
Read More
Centre 10

Centre 10

Centre 10 Two attempts had been made by others to build two high-rise condo towers on the site of the former Gaslight Square retail strip at 10th Ave and 4th
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More