The Fuse at Evolution

The Fuse at Evolution

Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal in EV in over a decade have committed to building about 700,000 sq. ft. of mixed-use residential property starting with The Fuse at Evolution.

HCM Contractors Inc. proposed an alternative design-build excavation shoring system that resulted in significant schedule and cost savings. With its’ local geotechnical knowledge and utilizing its two new Bauer BG24 drill rigs and segmental casing system, HCM showcased its ability to design, execute and bring a quality product to its’ client, Embassy Development Ltd.

HCM has also secured contracts on the next two East Village developments that include the long anticipated National Music Centre and First Condominiums. HCM is proud to be a part of this landmark development which is considered to be a turning point in East Village history and a transformative moment for EV.

Client: Embassy Bosa Inc
Location: Calgary, Alberta

Highland Creek WWTP

Highland Creek WWTP Due to increased population and the requirement for treating excess amounts of waste water, Highland Creek WWTP underwent a significant upgrade to provide clean water for the
Read More
Love Condos

Love Condos

Love Condos This project involved approx 41,000 sf of piles and lagging temporary shoring system. The project was broken into two phase both consisting of piles and lagging with both
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More
HCM Group - K2 Condominiums

K2 Condominiums

K2 Condominiums This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging
Read More
Centre 10

Centre 10

Centre 10 Two attempts had been made by others to build two high-rise condo towers on the site of the former Gaslight Square retail strip at 10th Ave and 4th
Read More
Mars B Toronto General Hospital

Mars B Toronto General Hospital

This 3.5 Million dollar contract involved HC Matcon providing a full excavation, a 16,000 Sq. Ft. shoring and large diameter caisson package for this project. Challenges included the support of
Read More