Cobourg Railway Station

Cobourg Railway Station

On this project, HCM, in conjunction with its in-house engineering company, RWH Engineering Inc. (RWH), was able to offer the owner one source for the design, supply, and installation of a complete temporary shoring system and precision monitoring services. 

RWH produced an efficient design that conformed to AREMA railway standards and resulted in savings to the owner, in comparison to the original tendered drawings. The RWH design included a double pile and lagging system with 17.5 meter long tiebacks, required due to the soft soils. In addition, HCM installed 275 mm diameter permanent micropiles at the base of the shoring. The micropiles extended through 12 meters of soil and were founded 5 meters into bedrock to provide the required capacity. 

The general contractor benefited from working with a single source that could take responsibility for all aspects of the shoring and deep foundations work – guaranteeing quality and reducing costs.

Client: Via Rail Canada Inc.

Location: Cobourg, Ontario

Centron Business Park Retaining Wall

Centron Business Park Retaining Wall

Steep Slope Retaining Wall The site topography presented the developer with the challenging task of constructing a permanent retaining wall structure into a hill formation near Blackfoot Trail in southeast
Read More
The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More

Weston Road

Weston Road The Metrolinx Weston Tunnel project will serve as a below grade rail corridor for the GO Georgetown line linking the airport to downtown Toronto. HCM was subcontracted by
Read More
Telus Sky tower - HC Matcon

Telus Sky tower

Telus Sky tower The Telus Sky tower will be the 3rd tallest building in Calgary with the deepest basement excavation in western Canada. HC Group took on the challenge of
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More
Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More