Cobourg Railway Station

Cobourg Railway Station

On this project, HCM, in conjunction with its in-house engineering company, RWH Engineering Inc. (RWH), was able to offer the owner one source for the design, supply, and installation of a complete temporary shoring system and precision monitoring services. 

RWH produced an efficient design that conformed to AREMA railway standards and resulted in savings to the owner, in comparison to the original tendered drawings. The RWH design included a double pile and lagging system with 17.5 meter long tiebacks, required due to the soft soils. In addition, HCM installed 275 mm diameter permanent micropiles at the base of the shoring. The micropiles extended through 12 meters of soil and were founded 5 meters into bedrock to provide the required capacity. 

The general contractor benefited from working with a single source that could take responsibility for all aspects of the shoring and deep foundations work – guaranteeing quality and reducing costs.

Client: Via Rail Canada Inc.

Location: Cobourg, Ontario

8 Ida Street

8 Ida Street HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack
Read More

University of Toronto Faculty of Law

TTC Steels Launch Shaft The expansion of the Faculty of Law building at the University of Toronto incorporated the addition of another storey to the existing building. The increased loading
Read More

Oshawa Mall

Oshawa Mall The Oshawa Mall expansion was a large project that required several foundation and shoring services. HCM met the needs of the contractor by providing both tied back and
Read More
Currie Reservoir - Continuous Caisson Wall

Currie Reservoir – Continuous Caisson Wall

Increased Safety: We Used Horizontal H-Piles This project is a part of a large upgrade to the Currie Reservoir in southwest Calgary, Alberta. The project included the installation of a
Read More
Mars B Toronto General Hospital

Mars B Toronto General Hospital

This 3.5 Million dollar contract involved HC Matcon providing a full excavation, a 16,000 Sq. Ft. shoring and large diameter caisson package for this project. Challenges included the support of
Read More
Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More