The Telus Sky tower will be the 3rd tallest building in Calgary with the deepest basement excavation in western Canada. HCM Group took on the challenge of creating a shoring system suitable for the 30m excavation. RWH designed the shoring system with an 11m deep perched secant wall and shotcrete was used in the bedrock to stabilize the rest of the excavation. HCM contractors were responsible for the installation of the perched secant wall and the shotcrete.

The project was not without its challenges. These challenges included neighboring structures, the LRT system that ran adjacent to the site, existing Telus utilities and limited working space within the excavation. An extremely sensitive Telus duct bank ran adjacent to the excavation and the movement of the bank had to be kept to a minimum. RWH had to take this into consideration when designing the wall. The footprint of the excavation was only 2,100m2. HCM contractors were able to work strategically with other sub-contractors to ensure work could be carried out seamlessly in the small area. RWH provided precision monitoring of the shoring, neighboring structures and the LRT line. Monitoring reports were provided twice a week until the excavation reached sound bedrock and it was then reduced to weekly.

HCM Group were able to use their experience with similar past projects to design and construct a shoring system that was suitable for the 30m excavation. The shoring moved 75% of what was originally predicted, proving it was more than adequate.

Client: Icon West Construction

Location: Calgary, Alberta

HC Group - Telus Sky Shoring Clean Wall
Telus Sky tower - HC Matcon
Telus Sky tower - HC Matcon
Telus Sky tower - HC Matcon

Alloa Feedermain

Alloa Feedermain This project involved installation of 3 watertight caisson wall shafts. Two rectangular secant pile wall shaft approx 12m deep and one 6m diameter compression ring shaft approx 7m
Read More
Centron Business Park Retaining Wall

Centron Business Park Retaining Wall

Steep Slope Retaining Wall The site topography presented the developer with the challenging task of constructing a permanent retaining wall structure into a hill formation near Blackfoot Trail in southeast
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More
TTC St. Clair Station

TTC St. Clair Station

Overcoming Tight Access and High Water Table Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During
Read More

Odeon Ronmore Development

Odeon Ronmore Development HCM was contracted to provide the design and installation of shoring system for a mixed use commercial development in the main corridor of the Garrison Woods area