Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs

Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts and storm and sewer pipe in downtown Barrie, Ontario.

  • Helical pile support systems were ideal for use on the project based on the type of soils encountered and the project location related to the nearby lake. Excavation parameters were further impeded by the proximity of streets and roads required to be in operation while the work was in progress. 50 Kip design capacities were achieved on small diameter pipe, (2-7/8) which were installed and torqued as required.
  • The versatility of the installations enabled the Owner to minimize costs by installing only lengths and depths required.
  • Due to the nature and achievable installation production rate it was possible to stay ahead of the concrete work as small areas of work were excavated in sections.

The helical pile supports were utilized on both the Kidd’s Creek project as well as the second phase of the retrofit and expansion located at Toronto and Simcoe Streets in Barrie, Ontario.

Client: Drainstar Contracting Ltd
Location: Barrie, Ontario

TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More
HC Matcon - Twinning of the West Trunk Sanitary Sewer

Twinning of the West Trunk Sanitary Sewer

Twinning Of The West Trunk Sanitary Sewer This project includes the installation of a deep trunk sanitary sewer within bedrock under Erin Mills Parkway in Mississauga. HCM together with RWH Engineering
Read More
St. Joseph's Health Centre Parking

St. Joseph’s Health Centre Parking

Shotcrete Reduces Costs for Owner The St. Joseph’s Health Centre is adding a new Our Lady of Mercy wing complete with three levels of underground parking. HC Matcon was responsible
Read More

TTC Patten Building

TTC Patten Building HC Matcon was retained to install micropile foundation for TTC Patten Building on 835 Davenport Road, Toronto. The building was originally designed for storage of paper tickets
Read More

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More
LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall HC Matcon (HCM) and RWH Engineering (RWH) reacted quickly after being contacted to provide a design-build solution for a slope failure that occurred during
Read More