Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs

Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts and storm and sewer pipe in downtown Barrie, Ontario.

  • Helical pile support systems were ideal for use on the project based on the type of soils encountered and the project location related to the nearby lake. Excavation parameters were further impeded by the proximity of streets and roads required to be in operation while the work was in progress. 50 Kip design capacities were achieved on small diameter pipe, (2-7/8) which were installed and torqued as required.
  • The versatility of the installations enabled the Owner to minimize costs by installing only lengths and depths required.
  • Due to the nature and achievable installation production rate it was possible to stay ahead of the concrete work as small areas of work were excavated in sections.

The helical pile supports were utilized on both the Kidd’s Creek project as well as the second phase of the retrofit and expansion located at Toronto and Simcoe Streets in Barrie, Ontario.

Client: Drainstar Contracting Ltd
Location: Barrie, Ontario

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More

144 Park Street

144 Park Street During the bidding process, HCM proposed an innovative design-build shoring solution for the 144 Park Street project, a 19 storey condominium in the downtown core of Waterloo.
Read More
Niagara Biosolids Facility - Inside Pit

Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines
Read More
Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2 HC Matcon’s project at the Siemens Energy Blade Plant consisted of the design, supply & installation of 70 helical piers within the existing
Read More
Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion The Government of Alberta and Alberta Health Services (AHS) have broken ground on this project, which will renovate and expand the hospital
Read More

Weston Road

Weston Road The Metrolinx Weston Tunnel project will serve as a below grade rail corridor for the GO Georgetown line linking the airport to downtown Toronto. HCM was subcontracted by
Read More