The foundation of an existing residential apartment building in Southwest Calgary was compromised and required remedial measures to be completed. 

RWH designed a micropile underpinning system based on the initial geotechnical investigation. Together, HCM and RWH developed a testing strategy to confirm the soil bond strength and the design parameters obtained from the report. This involved installing and loading a sacrificial micropile to 250% of the design load. The test was successful and the remaining production micropiles were installed as designed.   

The challenging aspect of this project was working within the confined space beneath the building.  Initially having only a 1.2m headroom restriction, the installation areas were excavated to 2.3m below the bottom floor in a series of trenches and ventilation openings were constructed.  A low headroom? TEI rock drill was brought into the confined space in pieces and reassembled at the drilling locations.  Furthermore, the compressor for the drill had to be located outside the building.

These challenges were met with efficient and safe solutions by HCM.

Client: Madden Matthews Eng. Ltd.

Location: Calgary, Alberta

Dufferin Jog Elimination

Dufferin Jog Elimination This project involved the extension of Duffering Street under an existing CN rail line and through the abutment wall of a century old CN bridge at Queen
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More
TTC St. Clair Station

TTC St. Clair Station

Overcoming Tight Access and High Water Table Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During
Read More

Twinning Tunnels

Twinning Tunnels The installation of a deep trunk sanitary sewer system in the bedrock beneath Erin Mills Parkway in Mississauga required an innovative approach for shoring manholes. For this project,
Read More

George Street Bridge

George Street Bridge This bridge replacement project required the drilling of two abutments consisting of a total of 32 drilled caissons in the existing creek bed. In addition to the
Read More

The Osterberg Cell

The Osterberg Cell HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close
Read More