Credit Valley Hospital

Alternative to Save Time and Money

The Credit Valley Hospital in Mississauga, Ontario is undergoing a massive expansion and renovation. HC Matcon was brought in to undertake the shoring, underpinning, and caissons for this construction. The majority of the work included the drilling and installation of 222 concrete caissons, ranging between 24- and 84-inches in diameter. The original design required concrete-encased steel beams and conventional timber-lagged shoring adjacent to the operating hospital for support of the existing building and excavation. HC Matcon proposed an alternate to use vertical micropiles and shotcrete shoring in lieu of the above, which resulted in less disruption to the functioning hospital. The acceptance of this proposal also allowed a savings in cost and schedule time for the general contractor and owner. HC Matcon is able to overcome challenges while working with all parties involved to add value and cost savings to a project.

Client: Bondfield Construction
Location: Mississauga, Ontario

Great Lakes Copper Plant

Great Lakes Copper Plant

Great Lakes Copper Plant The Great Lakes Copper Plant in London, Ontario, posed a technical challenge in shotcrete shoring. HC Matcon helped to facilitate the installation of a new copper
Read More
CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms.
Read More
Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More
Centron Business Park Retaining Wall

Centron Business Park Retaining Wall

Steep Slope Retaining Wall The site topography presented the developer with the challenging task of constructing a permanent retaining wall structure into a hill formation near Blackfoot Trail in southeast
Read More
Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More
Mars B Toronto General Hospital

Mars B Toronto General Hospital

This 3.5 Million dollar contract involved HC Matcon providing a full excavation, a 16,000 Sq. Ft. shoring and large diameter caisson package for this project. Challenges included the support of