Skip to content

Credit Valley Hospital

Alternative to Save Time and Money

The Credit Valley Hospital in Mississauga, Ontario is undergoing a massive expansion and renovation. HC Matcon was brought in to undertake the shoring, underpinning, and caissons for this construction. The majority of the work included the drilling and installation of 222 concrete caissons, ranging between 24- and 84-inches in diameter. The original design required concrete-encased steel beams and conventional timber-lagged shoring adjacent to the operating hospital for support of the existing building and excavation. HC Matcon proposed an alternate to use vertical micropiles and shotcrete shoring in lieu of the above, which resulted in less disruption to the functioning hospital. The acceptance of this proposal also allowed a savings in cost and schedule time for the general contractor and owner. HC Matcon is able to overcome challenges while working with all parties involved to add value and cost savings to a project.

Client: Bondfield Construction
Location: Mississauga, Ontario

Upper House Condominiums - Caisson Wall Piles and Lagging

Upper House Condominiums

Upper House Condominiums HCM completed the shoring for the eight storey Upper House Condominium project which required a 12m deep excavation for two levels of underground parking. A tied-back shoring
Read More
Mount Royal University Conservatory

Mount Royal University Conservatory

Mount Royal University Conservatory Design considerations for the foundations were similar to previous projects in the area, with installation of approx. 220 cast-in-place belled piles. The project design team for
Read More

Silver Creek Solar Farm

Silver Creek Solar Farm For this project, HCM provided installation services to EllisDon for the helical pile foundations for future solar racking. Due to the stringent timelines and project milestones,
Read More
Niagara Biosolids Facility - Inside Pit

Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines
Read More

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More
HCM Group - K2 Condominiums

K2 Condominiums

K2 Condominiums This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging
Read More