Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem

Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment.

  • Due to the tight confines of the site and the proximity of exterior walls, columns and footings, the use of a traditional soldier pile and lagging system was not feasible.
  • Instead, a shotcrete shoring and underpinning solution was developed in conjunction with the Owner and the General Contractor.
  • By working with the forming contractor, a zero clearance solution was used as the backside of the new form work.
  • In addition to vertical cut stability, the shotcrete was also designed to provide underpinning stabilization to the undermined column pad footings and exterior wall footings.
  • By placing strategically located vertical mini piles at and around the pad footings, the additional stabilization was achieved.

The use of the shotcrete solution in this application allowed the General Contractor to minimize disturbance and disruption to the ongoing facility operations.

Client: Stucor Construction Ltd
Location: Niagara Falls, Ontario

Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2 HC Matcon’s project at the Siemens Energy Blade Plant consisted of the design, supply & installation of 70 helical piers within the existing
Read More
Grand House

Grand House

Difficult But Not Impossible The Grand House is a student designed and constructed co-operative housing project located in Cambridge, Ontario.  It has won awards and is a landmark building. Due
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More

Mapleview Drive

Mapleview Drive The expansion of Mapleview Drive in Barrie required track protection for an existing railway overpass. HCM was retained to install a strutted piles and lagging shoring system. RWH
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More

Burke Residence

Burke Residence The site topography presented the challenging task of installing shoring on steep slopes which impeded the accessibility of conventional equipment to the residential lot at the back alley
Read More