The site topography presented the challenging task of installing shoring on steep slopes which impeded the accessibility of conventional equipment to the residential lot at the back alley portion of the site. The site was located in the Elboya Park region of SW Calgary. The purpose of the shoring was to protect the adjacent neighbouring property and utilities along the east, west and back sides of the site.

The east and the west sides of the property were shored with a cantilever steel pipe and timber lagging system. The shoring on these sides extended to 11 feet below grade, and approximately 70 feet long for a total area of 1,800 square feet.

The back side of the property presented the greatest challenge as it was along the steepest slope of the site with a designed depth of 15 feet below grade. Due to the site conditions, shotcrete was an ideal shoring solution. The total area of the shotcrete shoring covered 350 square feet.

Due to the residential nature of the site special emphasis was put on the impact of the project to the surrounding area. The disruption to neighbouring properties, along with noise and vibration and existing structures was carefully monitored and managed.

HCM finished the project on schedule completing in two planned stages according to the progress requirements of the general contractor.

Client: Hillson Homes

Location: Calgary, Alberta

Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More
Grand House

Grand House

Difficult But Not Impossible The Grand House is a student designed and constructed co-operative housing project located in Cambridge, Ontario.  It has won awards and is a landmark building. Due
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More
TTC St. Clair Station

TTC St. Clair Station

Overcoming Tight Access and High Water Table Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During