Burke Residence

Burke Residence

The site topography presented the challenging task of installing shoring on steep slopes which impeded the accessibility of conventional equipment to the residential lot at the back alley portion of the site. The site was located in the Elboya Park region of SW Calgary. The purpose of the shoring was to protect the adjacent neighbouring property and utilities along the east, west and back sides of the site.

The east and the west sides of the property were shored with a cantilever steel pipe and timber lagging system. The shoring on these sides extended to 11 feet below grade, and approximately 70 feet long for a total area of 1,800 square feet.

The back side of the property presented the greatest challenge as it was along the steepest slope of the site with a designed depth of 15 feet below grade. Due to the site conditions, shotcrete was an ideal shoring solution. The total area of the shotcrete shoring covered 350 square feet.

Due to the residential nature of the site special emphasis was put on the impact of the project to the surrounding area. The disruption to neighbouring properties, along with noise and vibration and existing structures was carefully monitored and managed.

HCM finished the project on schedule completing in two planned stages according to the progress requirements of the general contractor.

Client: Hillson Homes

Location: Calgary, Alberta

St. Joseph's Healthcare Redevelopment Project

St. Joseph’s Healthcare Redevelopment Project

Unique Soil Conditions The future location for this tower is located immediately adjacent to the emergency wing of the existing St. Joseph’s hospital in Hamilton, Ontario. HCM is a recognized
Read More

Parkside Dr. Slope Stabilization

Parkside Dr. Slope Stabilization The City of Toronto tendered a slope stabilization project that required the installation of helical piles in the embankment of a failed slope on Parkside Drive
Read More
Canada Post Micropiles

Canada Post Micropiles

No Emissions, No Problem The Canada Post McKnight Mail Processing Centre Expansion project involved the installation of micropiles to support a renovation within the facility in northeast Calgary, Alberta. As
Read More
Niagara Biosolids Facility - Inside Pit

Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines
Read More
65 Lillian Street Condominium Building

65 Lillian Street Condominium Building

65 Lillian Street Condominium Building Work on this jobsite included the excavation support system for a new condominium building located on 65 Lillian Street in Toronto, Ontario. HC Matcon used
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More