Burke Residence

Burke Residence

The site topography presented the challenging task of installing shoring on steep slopes which impeded the accessibility of conventional equipment to the residential lot at the back alley portion of the site. The site was located in the Elboya Park region of SW Calgary. The purpose of the shoring was to protect the adjacent neighbouring property and utilities along the east, west and back sides of the site.

The east and the west sides of the property were shored with a cantilever steel pipe and timber lagging system. The shoring on these sides extended to 11 feet below grade, and approximately 70 feet long for a total area of 1,800 square feet.

The back side of the property presented the greatest challenge as it was along the steepest slope of the site with a designed depth of 15 feet below grade. Due to the site conditions, shotcrete was an ideal shoring solution. The total area of the shotcrete shoring covered 350 square feet.

Due to the residential nature of the site special emphasis was put on the impact of the project to the surrounding area. The disruption to neighbouring properties, along with noise and vibration and existing structures was carefully monitored and managed.

HCM finished the project on schedule completing in two planned stages according to the progress requirements of the general contractor.

Client: Hillson Homes

Location: Calgary, Alberta

George Street Bridge

George Street Bridge This bridge replacement project required the drilling of two abutments consisting of a total of 32 drilled caissons in the existing creek bed. In addition to the
Read More
St. Thomas Courthouse

St. Thomas Courthouse

Alternate Methods Stop Running Sands HCM was retained to design, supply and install a complete shoring system to facilitate construction of the new St. Thomas Court House for EllisDon. Construction
Read More
Wal-Mart Micropiles

Wal-Mart Micropiles

Overcoming Poorly Engineered Fill This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill. The previous winter
Read More
Milton Grade Separation

Milton Grade Separation

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario
Read More
Smith Residence

Smith Residence

Toronto’s First Permanent Soil Nail Wall This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in
Read More

The Osterberg Cell

The Osterberg Cell HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close
Read More