Spray River Bridge

Spray River Bridge

During the 2013 flooding in Southern Alberta, the Spray River undermined the foundation of a 24m long all season bridge causing the bridge to collapse.   As the bridge was located on a non-motorized pathway in Banff National Park – 10km from the nearest road – the project required a solution that took into account the remote location. 

The existing bridge was able to be reused, but required a new alignment and redesigned footings.  RWH worked in conjunction with Parks Canada to design a piling solution for the new foundation.  A major consideration was designing for future scour depths and therefore pipe micropiles were selected. The design included eight micropiles, each extending 12m deep. The equipment was trammed to the location using existing fire roads and a cable tram was used to access the far side as protection of the surrounding natural environment was a key priority on this project. 

HCM’s versatile team worked together to handle this small, yet challenging job and successfully met the client’s unique project requirements.

Client: Parks Canada

Location: Banff National Park, Alberta

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation HC Matcon achieved a significant milestone on the Weston Tunnel project, allowing for the GC to accelerate the schedule and make up for project delays. HCM
Read More
London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More
Wal-Mart Micropiles

Wal-Mart Micropiles

Overcoming Poorly Engineered Fill This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill. The previous winter
Read More

Highland Creek WWTP

Highland Creek WWTP Due to increased population and the requirement for treating excess amounts of waste water, Highland Creek WWTP underwent a significant upgrade to provide clean water for the
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More