Spray River Bridge

Spray River Bridge

During the 2013 flooding in Southern Alberta, the Spray River undermined the foundation of a 24m long all season bridge causing the bridge to collapse.   As the bridge was located on a non-motorized pathway in Banff National Park – 10km from the nearest road – the project required a solution that took into account the remote location. 

The existing bridge was able to be reused, but required a new alignment and redesigned footings.  RWH worked in conjunction with Parks Canada to design a piling solution for the new foundation.  A major consideration was designing for future scour depths and therefore pipe micropiles were selected. The design included eight micropiles, each extending 12m deep. The equipment was trammed to the location using existing fire roads and a cable tram was used to access the far side as protection of the surrounding natural environment was a key priority on this project. 

HCM’s versatile team worked together to handle this small, yet challenging job and successfully met the client’s unique project requirements.

Client: Parks Canada

Location: Banff National Park, Alberta

Cobourg Railway Station

Cobourg Railway Station On this project, HCM, in conjunction with its in-house engineering company, RWH Engineering Inc. (RWH), was able to offer the owner one source for the design, supply,
Read More
Currie Reservoir - Continuous Caisson Wall

Currie Reservoir – Continuous Caisson Wall

Increased Safety: We Used Horizontal H-Piles This project is a part of a large upgrade to the Currie Reservoir in southwest Calgary, Alberta. The project included the installation of a
Read More
CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms.
Read More
Wal-Mart Micropiles

Wal-Mart Micropiles

Overcoming Poorly Engineered Fill This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill. The previous winter
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope
Read More
Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2 HC Matcon’s project at the Siemens Energy Blade Plant consisted of the design, supply & installation of 70 helical piers within the existing
Read More