Spray River Bridge

Spray River Bridge

During the 2013 flooding in Southern Alberta, the Spray River undermined the foundation of a 24m long all season bridge causing the bridge to collapse.   As the bridge was located on a non-motorized pathway in Banff National Park – 10km from the nearest road – the project required a solution that took into account the remote location. 

The existing bridge was able to be reused, but required a new alignment and redesigned footings.  RWH worked in conjunction with Parks Canada to design a piling solution for the new foundation.  A major consideration was designing for future scour depths and therefore pipe micropiles were selected. The design included eight micropiles, each extending 12m deep. The equipment was trammed to the location using existing fire roads and a cable tram was used to access the far side as protection of the surrounding natural environment was a key priority on this project. 

HCM’s versatile team worked together to handle this small, yet challenging job and successfully met the client’s unique project requirements.

Client: Parks Canada

Location: Banff National Park, Alberta

Burke Residence

Burke Residence The site topography presented the challenging task of installing shoring on steep slopes which impeded the accessibility of conventional equipment to the residential lot at the back alley
Read More
The Bow

The Bow

The future Bow building, located in Calgary, Alberta Canada, is an innovation in both architectural and shoring design. At 58 stories and with a footprint of two city blocks, The
Read More
Canada Post Micropiles

Canada Post Micropiles

No Emissions, No Problem The Canada Post McKnight Mail Processing Centre Expansion project involved the installation of micropiles to support a renovation within the facility in northeast Calgary, Alberta. As
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope
Read More

Odeon Ronmore Development

Odeon Ronmore Development HCM was contracted to provide the design and installation of shoring system for a mixed use commercial development in the main corridor of the Garrison Woods area
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More