The foundation of an existing residential apartment building in Southwest Calgary was compromised and required remedial measures to be completed. 

RWH designed a micropile underpinning system based on the initial geotechnical investigation. Together, HCM and RWH developed a testing strategy to confirm the soil bond strength and the design parameters obtained from the report. This involved installing and loading a sacrificial micropile to 250% of the design load. The test was successful and the remaining production micropiles were installed as designed.   

The challenging aspect of this project was working within the confined space beneath the building.  Initially having only a 1.2m headroom restriction, the installation areas were excavated to 2.3m below the bottom floor in a series of trenches and ventilation openings were constructed.  A low headroom? TEI rock drill was brought into the confined space in pieces and reassembled at the drilling locations.  Furthermore, the compressor for the drill had to be located outside the building.

These challenges were met with efficient and safe solutions by HCM.

Client: Madden Matthews Eng. Ltd.

Location: Calgary, Alberta

St. Joseph's Healthcare Redevelopment Project

St. Joseph’s Healthcare Redevelopment Project

Unique Soil Conditions The future location for this tower is located immediately adjacent to the emergency wing of the existing St. Joseph’s hospital in Hamilton, Ontario. HCM is a recognized
Read More

8 Ida Street

8 Ida Street HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack
Read More

Odeon Ronmore Development

Odeon Ronmore Development HCM was contracted to provide the design and installation of shoring system for a mixed use commercial development in the main corridor of the Garrison Woods area
Read More
Upper House Condominiums - Caisson Wall Piles and Lagging

Upper House Condominiums

Upper House Condominiums HCM completed the shoring for the eight storey Upper House Condominium project which required a 12m deep excavation for two levels of underground parking. A tied-back shoring
Read More

Pixel by Battistella

Pixel by Battistella HCM was contracted to provide the design and installation of shoring system for a 110 unit building consisting of town homes, studios and condos. This development was
Read More
Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More