Sarcee Trail

Sarcee Trail

The foundation of an existing residential apartment building in Southwest Calgary was compromised and required remedial measures to be completed. 

RWH designed a micropile underpinning system based on the initial geotechnical investigation. Together, HCM and RWH developed a testing strategy to confirm the soil bond strength and the design parameters obtained from the report. This involved installing and loading a sacrificial micropile to 250% of the design load. The test was successful and the remaining production micropiles were installed as designed.   

The challenging aspect of this project was working within the confined space beneath the building.  Initially having only a 1.2m headroom restriction, the installation areas were excavated to 2.3m below the bottom floor in a series of trenches and ventilation openings were constructed.  A low headroom? TEI rock drill was brought into the confined space in pieces and reassembled at the drilling locations.  Furthermore, the compressor for the drill had to be located outside the building.

These challenges were met with efficient and safe solutions by HCM.

Client: Madden Matthews Eng. Ltd.

Location: Calgary, Alberta

Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More
HC Matcon - Twinning of the West Trunk Sanitary Sewer

Twinning of the West Trunk Sanitary Sewer

Twinning Of The West Trunk Sanitary Sewer This project includes the installation of a deep trunk sanitary sewer within bedrock under Erin Mills Parkway in Mississauga. HCM together with RWH Engineering
Read More

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at
Read More

Weston Road

Weston Road The Metrolinx Weston Tunnel project will serve as a below grade rail corridor for the GO Georgetown line linking the airport to downtown Toronto. HCM was subcontracted by
Read More

Brantford General Hospital

Brantford General Hospital This innovative project represents the first use of shotcrete shoring in place of caisson walls against a building in Ontario. Caisson walls have typically been utilized duw
Read More