The foundation of an existing residential apartment building in Southwest Calgary was compromised and required remedial measures to be completed. 

RWH designed a micropile underpinning system based on the initial geotechnical investigation. Together, HCM and RWH developed a testing strategy to confirm the soil bond strength and the design parameters obtained from the report. This involved installing and loading a sacrificial micropile to 250% of the design load. The test was successful and the remaining production micropiles were installed as designed.   

The challenging aspect of this project was working within the confined space beneath the building.  Initially having only a 1.2m headroom restriction, the installation areas were excavated to 2.3m below the bottom floor in a series of trenches and ventilation openings were constructed.  A low headroom? TEI rock drill was brought into the confined space in pieces and reassembled at the drilling locations.  Furthermore, the compressor for the drill had to be located outside the building.

These challenges were met with efficient and safe solutions by HCM.

Client: Madden Matthews Eng. Ltd.

Location: Calgary, Alberta

Mill Pond Estates

Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg. The project was completed during winter months with
Read More
Smith Residence

Smith Residence

Toronto’s First Permanent Soil Nail Wall This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More
CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms.
Read More
Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion The Government of Alberta and Alberta Health Services (AHS) have broken ground on this project, which will renovate and expand the hospital