TTC Patten Building

TTC Patten Building

HC Matcon was retained to install micropile foundation for TTC Patten Building on 835 Davenport Road, Toronto. The building was originally designed for storage of paper tickets and when TTC transitioned to using tokens the increased loading caused settlement and structural issues which required strengthening of its foundations. 

The project consisted of drilling and installing 90 micropiles to a depth of 15M.  Working conditions presented an issue as drilling was restricted in a basement of an existing building where headroom was 3.5 meters high. HCM mobilized the Klemm low headroom drill rig in order to complete the project with productions to meet the strict deadlines required from TTC. 

The project was completed in a timely fashion and on budget. HC Matcon is well equipped to deal with difficult conditions presented on any project and are experts in micropile installations.

Client: Toronto Transit Commission & Buttcon LTD.

Location: Toronto, Ontario

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at
Read More
Wal-Mart Micropiles

Wal-Mart Micropiles

Overcoming Poorly Engineered Fill This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill. The previous winter
Read More

Mapleview Drive

Mapleview Drive The expansion of Mapleview Drive in Barrie required track protection for an existing railway overpass. HCM was retained to install a strutted piles and lagging shoring system. RWH
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
St. Thomas Courthouse

St. Thomas Courthouse

Alternate Methods Stop Running Sands HCM was retained to design, supply and install a complete shoring system to facilitate construction of the new St. Thomas Court House for EllisDon. Construction
Read More