TTC Patten Building

TTC Patten Building

HC Matcon was retained to install micropile foundation for TTC Patten Building on 835 Davenport Road, Toronto. The building was originally designed for storage of paper tickets and when TTC transitioned to using tokens the increased loading caused settlement and structural issues which required strengthening of its foundations. 

The project consisted of drilling and installing 90 micropiles to a depth of 15M.  Working conditions presented an issue as drilling was restricted in a basement of an existing building where headroom was 3.5 meters high. HCM mobilized the Klemm low headroom drill rig in order to complete the project with productions to meet the strict deadlines required from TTC. 

The project was completed in a timely fashion and on budget. HC Matcon is well equipped to deal with difficult conditions presented on any project and are experts in micropile installations.

Client: Toronto Transit Commission & Buttcon LTD.

Location: Toronto, Ontario

Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More
Mill Pond Estates

Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg. The project was completed during winter months with
Read More
The Bow

The Bow

The future Bow building, located in Calgary, Alberta Canada, is an innovation in both architectural and shoring design. At 58 stories and with a footprint of two city blocks, The
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More