Cobourg Railway Station

Cobourg Railway Station

On this project, HCM, in conjunction with its in-house engineering company, RWH Engineering Inc. (RWH), was able to offer the owner one source for the design, supply, and installation of a complete temporary shoring system and precision monitoring services. 

RWH produced an efficient design that conformed to AREMA railway standards and resulted in savings to the owner, in comparison to the original tendered drawings. The RWH design included a double pile and lagging system with 17.5 meter long tiebacks, required due to the soft soils. In addition, HCM installed 275 mm diameter permanent micropiles at the base of the shoring. The micropiles extended through 12 meters of soil and were founded 5 meters into bedrock to provide the required capacity. 

The general contractor benefited from working with a single source that could take responsibility for all aspects of the shoring and deep foundations work – guaranteeing quality and reducing costs.

Client: Via Rail Canada Inc.

Location: Cobourg, Ontario

Grand House

Grand House

Difficult But Not Impossible The Grand House is a student designed and constructed co-operative housing project located in Cambridge, Ontario.  It has won awards and is a landmark building. Due
Read More

Mapleview Drive

Mapleview Drive The expansion of Mapleview Drive in Barrie required track protection for an existing railway overpass. HCM was retained to install a strutted piles and lagging shoring system. RWH
Read More

Herald Block

Herald Block HCM was chosen to provide a comprehensive design-build shoring solution for Phase 1 of Brookfield Place development, which will become the tallest building in Western Canada. The excavation
Read More

TTC Patten Building

TTC Patten Building HC Matcon was retained to install micropile foundation for TTC Patten Building on 835 Davenport Road, Toronto. The building was originally designed for storage of paper tickets
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More