Wal-Mart Micropiles

Overcoming Poorly Engineered Fill

This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill.

  • The previous winter had frozen some of the fill, and footing settlements of up to 3 inches were on-going as the steel was erected.
  • HC Matcon mobilized a Design Build solution utilizing 60 Ft. long micro piles, with special connections to the already designed footings and piers. Sacrificial steel design was used to provide low cost micro piles.
  • HC Matcon worked 7 days per week for 3 weeks to install 192 piles.

The Walmart store opened on schedule and was a technical success. HC Matcon is innovative when problems occur, working with owners and General Contractors to find the most economical solution.

Client: Buttcon Ltd
Location: Rexdale, Ontario

Talbot Street

Talbot Street HCM completed the design-build shoring for the Azure condominium project in downtown London. Due to the soil conditions encountered during initial drilling, a full depth caisson wall was
Read More
St. Joseph's Healthcare Redevelopment Project

St. Joseph’s Healthcare Redevelopment Project

Unique Soil Conditions The future location for this tower is located immediately adjacent to the emergency wing of the existing St. Joseph’s hospital in Hamilton, Ontario. HCM is a recognized
Read More

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at
Read More

The Osterberg Cell

The Osterberg Cell HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included:
Read More
Mars B Toronto General Hospital

Mars B Toronto General Hospital

This 3.5 Million dollar contract involved HC Matcon providing a full excavation, a 16,000 Sq. Ft. shoring and large diameter caisson package for this project. Challenges included the support of
Read More