Wal-Mart Micropiles

Overcoming Poorly Engineered Fill

This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill.

  • The previous winter had frozen some of the fill, and footing settlements of up to 3 inches were on-going as the steel was erected.
  • HC Matcon mobilized a Design Build solution utilizing 60 Ft. long micro piles, with special connections to the already designed footings and piers. Sacrificial steel design was used to provide low cost micro piles.
  • HC Matcon worked 7 days per week for 3 weeks to install 192 piles.

The Walmart store opened on schedule and was a technical success. HC Matcon is innovative when problems occur, working with owners and General Contractors to find the most economical solution.

Client: Buttcon Ltd
Location: Rexdale, Ontario

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at
Read More
CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms.
Read More
HC Matcon - Twinning of the West Trunk Sanitary Sewer

Twinning of the West Trunk Sanitary Sewer

Twinning Of The West Trunk Sanitary Sewer This project includes the installation of a deep trunk sanitary sewer within bedrock under Erin Mills Parkway in Mississauga. HCM together with RWH Engineering
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More
The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More
Milton Grade Separation

Milton Grade Separation

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario
Read More