144 Park Street

144 Park Street

During the bidding process, HCM proposed an innovative design-build shoring solution for the 144 Park Street project, a 19 storey condominium in the downtown core of Waterloo. HCM was retained by Mady Developments to design, supply, and install a complete 9,500 SF bypass shotcrete shoring system.

RWH Engineering Inc. (RWH), an HC Group company, took on the design and monitoring responsibility for the project. The design consisted of a tied-back bypass shotcrete shoring system to a depth of approximately 5 meters. Bypass shotcrete is a unique solution developed by HCM which combines the benefits of shotcrete with a traditional piling system.

HCM’s design-build approach allows for a single source of responsibility. The HCM/RWH integrated working relationship facilitates quick response to design changes and site issues that may occur, ultimately minimizing potential delays and helping to maintain project milestones.

Client: Mady Development Construction Ltd.

Location: Waterloo, Ontario

The HC Group team is positioned to provide exemplary service when performing design-build work – providing both cost and schedule savings to the project.

65 Lillian Street Condominium Building

65 Lillian Street Condominium Building

65 Lillian Street Condominium Building Work on this jobsite included the excavation support system for a new condominium building located on 65 Lillian Street in Toronto, Ontario. HC Matcon used
Read More

Talbot Street

Talbot Street HCM completed the design-build shoring for the Azure condominium project in downtown London. Due to the soil conditions encountered during initial drilling, a full depth caisson wall was
Read More
Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More

Oshawa Mall

Oshawa Mall The Oshawa Mall expansion was a large project that required several foundation and shoring services. HCM met the needs of the contractor by providing both tied back and
Read More

Alloa Feedermain

Alloa Feedermain This project involved installation of 3 watertight caisson wall shafts. Two rectangular secant pile wall shaft approx 12m deep and one 6m diameter compression ring shaft approx 7m
Read More
Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More