During the bidding process, HCM proposed an innovative design-build shoring solution for the 144 Park Street project, a 19 storey condominium in the downtown core of Waterloo. HCM was retained by Mady Developments to design, supply, and install a complete 9,500 SF bypass shotcrete shoring system.

RWH Engineering Inc. (RWH), an HC Group company, took on the design and monitoring responsibility for the project. The design consisted of a tied-back bypass shotcrete shoring system to a depth of approximately 5 meters. Bypass shotcrete is a unique solution developed by HCM which combines the benefits of shotcrete with a traditional piling system.

HCM’s design-build approach allows for a single source of responsibility. The HCM/RWH integrated working relationship facilitates quick response to design changes and site issues that may occur, ultimately minimizing potential delays and helping to maintain project milestones.

Client: Mady Development Construction Ltd.

Location: Waterloo, Ontario

The HC Group team is positioned to provide exemplary service when performing design-build work – providing both cost and schedule savings to the project.

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More
CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms.
Read More
St. Joseph's Health Centre Parking

St. Joseph’s Health Centre Parking

Shotcrete Reduces Costs for Owner The St. Joseph’s Health Centre is adding a new Our Lady of Mercy wing complete with three levels of underground parking. HC Matcon was responsible
Read More
Upper House Condominiums - Caisson Wall Piles and Lagging

Upper House Condominiums

Upper House Condominiums HCM completed the shoring for the eight storey Upper House Condominium project which required a 12m deep excavation for two levels of underground parking. A tied-back shoring
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope
Read More
Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More