Love Condos

Love Condos

This project involved approx 41,000 sf of piles and lagging temporary shoring system. The project was broken into two phase both consisting of piles and lagging with both rakers and tiebacks in order to avoid conflicts with neighboring properties. HCM along with RWH design and constructed the shoring system to meet the project scheduled and owners budget. By using in house engineering HCM was able to respond to changes in of the project quickly and effectively to ensure the project was completed on time.
Included on this project is:

• Pile and lagging walls

• Prestressed soil rock anchors

• Rakers and struts

• Regular monitoring

HCM worked closely with the General Contractor to ensure the shoring systems were built efficiently and as per the designs and specifications. In addition, together we were able to accelerate the overall project schedule.

Client: 59 Project Management
Location: Markham, Ontario

The Bow

The Bow

The future Bow building, located in Calgary, Alberta Canada, is an innovation in both architectural and shoring design. At 58 stories and with a footprint of two city blocks, The
Read More
Smith Residence

Smith Residence

Toronto’s First Permanent Soil Nail Wall This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in
Read More

Weston Road

Weston Road The Metrolinx Weston Tunnel project will serve as a below grade rail corridor for the GO Georgetown line linking the airport to downtown Toronto. HCM was subcontracted by
Read More
Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More

Dufferin Jog Elimination

Dufferin Jog Elimination This project involved the extension of Duffering Street under an existing CN rail line and through the abutment wall of a century old CN bridge at Queen
Read More