Dufferin Jog Elimination

Dufferin Jog Elimination

This project involved the extension of Duffering Street under an existing CN rail line and through the abutment wall of a century old CN bridge at Queen Street in Toronto. HCM performed a design-build tied back caisson wall solution for the main staging effort.

The geology of the soils was a combination of fills and wak silts over rock. The old bridge was jacked onto tower frames supported by cased micropiles. Low headroom caissons were installed by churn drilling with permanent liners. Further innovation included a tieback connection through abutments which avoided damage to the future surface of the structure.

HCM met scheduling requirements while performing several services throughout multiple phases, facilitating overall project success.

Client: Dufferin Construction

Location: Toronto, Ontario

Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope
Read More
HC Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

Sage Condominiums: Phase II The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More

McMaster Nuclear Building

McMaster Nuclear Building The nuclear research building was an upgrade to the existing structure to allow for world class nuclear research for leading nuclear scientists.  This project was funded by
Read More

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More