Dufferin Jog Elimination

Dufferin Jog Elimination

This project involved the extension of Duffering Street under an existing CN rail line and through the abutment wall of a century old CN bridge at Queen Street in Toronto. HCM performed a design-build tied back caisson wall solution for the main staging effort.

The geology of the soils was a combination of fills and wak silts over rock. The old bridge was jacked onto tower frames supported by cased micropiles. Low headroom caissons were installed by churn drilling with permanent liners. Further innovation included a tieback connection through abutments which avoided damage to the future surface of the structure.

HCM met scheduling requirements while performing several services throughout multiple phases, facilitating overall project success.

Client: Dufferin Construction

Location: Toronto, Ontario

Currie Reservoir - Continuous Caisson Wall

Currie Reservoir – Continuous Caisson Wall

Increased Safety: We Used Horizontal H-Piles This project is a part of a large upgrade to the Currie Reservoir in southwest Calgary, Alberta. The project included the installation of a
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More

The Osterberg Cell

The Osterberg Cell HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close
Read More

144 Park Street

144 Park Street During the bidding process, HCM proposed an innovative design-build shoring solution for the 144 Park Street project, a 19 storey condominium in the downtown core of Waterloo.
Read More
Mount Royal University Conservatory

Mount Royal University Conservatory

Mount Royal University Conservatory Design considerations for the foundations were similar to previous projects in the area, with installation of approx. 220 cast-in-place belled piles. The project design team for
Read More
Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More