Dufferin Jog Elimination

Dufferin Jog Elimination

This project involved the extension of Duffering Street under an existing CN rail line and through the abutment wall of a century old CN bridge at Queen Street in Toronto. HCM performed a design-build tied back caisson wall solution for the main staging effort.

The geology of the soils was a combination of fills and wak silts over rock. The old bridge was jacked onto tower frames supported by cased micropiles. Low headroom caissons were installed by churn drilling with permanent liners. Further innovation included a tieback connection through abutments which avoided damage to the future surface of the structure.

HCM met scheduling requirements while performing several services throughout multiple phases, facilitating overall project success.

Client: Dufferin Construction

Location: Toronto, Ontario

Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More
Wal-Mart Micropiles

Wal-Mart Micropiles

Overcoming Poorly Engineered Fill This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill. The previous winter
Read More

Herald Block

Herald Block HCM was chosen to provide a comprehensive design-build shoring solution for Phase 1 of Brookfield Place development, which will become the tallest building in Western Canada. The excavation
Read More

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at
Read More
Milton Grade Separation

Milton Grade Separation

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario
Read More
The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More