Sage Condominiums: Phase II

Sage Condominiums: Phase II

The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering Inc. (RWH), an HC Group company, was responsible for the design and provided precision monitoring throughout the duration of the project.

This project was innovatively designed to meet the needs of the owner. Despite the deep excavation and high building surcharge, RWH created an efficient shoring system that utilized only one level of pipe rakers. The use of bypass shotcrete over a caisson wall system advanced the project schedule as vertical drilling time was significantly reduced, allowing excavation to begin sooner. Shotcrete lagging has a smaller environmental footprint than timber lagging and eliminates the issue of wood rot next to existing buildings.

Client: IN8 Developments
Location: Waterloo, Ontario

The innovative design along with proactive construction management by HCM was the key to meeting project milestones. The small site coupled with the large structural members required well planned material deliveries, site organization, and crew management.

The ability to work together to meet special requirements on any project is a strength of the HCM/RWH team.

Centron Business Park Retaining Wall

Centron Business Park Retaining Wall

Steep Slope Retaining Wall The site topography presented the developer with the challenging task of constructing a permanent retaining wall structure into a hill formation near Blackfoot Trail in southeast
Read More
London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and
Read More
Smith Residence

Smith Residence

Toronto’s First Permanent Soil Nail Wall This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in
Read More
HCM Group - K2 Condominiums

K2 Condominiums

K2 Condominiums This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging
Read More

Talbot Street

Talbot Street HCM completed the design-build shoring for the Azure condominium project in downtown London. Due to the soil conditions encountered during initial drilling, a full depth caisson wall was
Read More
Great Lakes Copper Plant

Great Lakes Copper Plant

Great Lakes Copper Plant The Great Lakes Copper Plant in London, Ontario, posed a technical challenge in shotcrete shoring. HC Matcon helped to facilitate the installation of a new copper
Read More