Skip to content

Sage Condominiums: Phase II

Sage Condominiums: Phase II

The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering Inc. (RWH), an HC Group company, was responsible for the design and provided precision monitoring throughout the duration of the project.

This project was innovatively designed to meet the needs of the owner. Despite the deep excavation and high building surcharge, RWH created an efficient shoring system that utilized only one level of pipe rakers. The use of bypass shotcrete over a caisson wall system advanced the project schedule as vertical drilling time was significantly reduced, allowing excavation to begin sooner. Shotcrete lagging has a smaller environmental footprint than timber lagging and eliminates the issue of wood rot next to existing buildings.

Client: IN8 Developments
Location: Waterloo, Ontario

The innovative design along with proactive construction management by HCM was the key to meeting project milestones. The small site coupled with the large structural members required well planned material deliveries, site organization, and crew management.

The ability to work together to meet special requirements on any project is a strength of the HCM/RWH team.

Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More

Oshawa Mall

Oshawa Mall The Oshawa Mall expansion was a large project that required several foundation and shoring services. HCM met the needs of the contractor by providing both tied back and
Read More

Brantford General Hospital

Brantford General Hospital This innovative project represents the first use of shotcrete shoring in place of caisson walls against a building in Ontario. Caisson walls have typically been utilized duw
Read More
Weston Tunnel Grade Separation

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation HC Matcon achieved a significant milestone on the Weston Tunnel project, allowing for the GC to accelerate the schedule and make up for project delays. HCM
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More
LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall HC Matcon (HCM) and RWH Engineering (RWH) reacted quickly after being contacted to provide a design-build solution for a slope failure that occurred during
Read More