Skip to content

Currie Reservoir

Horizontal Underpinning

This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary. The interlocking secant pile wall (caisson wall) allows for an accelerated construction schedule as it eliminates the ground loss that is present with the use of other styles of shoring. Where utilities were present, bracing supports were used to resist the lateral pressures present behind the filler piles.

Unique to this job was the installation of horizontal underpinning. The job required a new connection between the existing reservoir and pump house. To accomplish this task, a tunnel had to be created to accommodate the 900mm connecting water pipe. The underpinning provides support for the tunnel walls. The system worked well; after excavation, the resulting tunnel allowed safe access for the installation of the connection pipe to the pump house.

Because of the job’s proximity to the working water reservoir, special environmental precautions had to be taken in order to avoid contamination. Site-specific procedures were implemented; in instances where lubricating oils had to be used, for example when sliding the horizontal underpinning beams, food grade oils were used over hydrocarbon-based oils. As a result, the integrity of the water supply was maintained throughout the duration of the project.

Client: PCL
Location: Calgary, Alberta

Paruk Residence

Paruk Residence

Overcoming Poor Soil-Bearing Capacity The Paruk Residence is a high end two story structure, located at 24 York Valley Crescent in North York, Ontario, just north of the Don River.
Read More
EEEL University of Calgary

EEEL University of Calgary

Zero Ground Loss This project followed shortly after finishing the Taylor Family Digital Library project, which was in close proximity to this site on the same campus. Design considerations for
Read More
Credit Valley Hospital

Credit Valley Hospital

Alternative to Save Time and Money The Credit Valley Hospital in Mississauga, Ontario is undergoing a massive expansion and renovation. HC Matcon was brought in to undertake the shoring, underpinning,
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More

Currie Barracks Residential Development

Currie Barracks Residential Development HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever
Read More
Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More