Smith Residence

Toronto’s First Permanent Soil Nail Wall

This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in Toronto.

  • Micro piles were used to support a cantilever canopy on one level and HC Matcon completed the full excavation, shoring and footings as a package to the owner.
  • The shoring design called for over sized MAI bars due to low corrosive soil, and a 100 year plus life is expected.
  • The house construction is wood framed which was a lower cost than steel/concrete in that hillside loads over time are taken by the shoring system, which is 150 mm from the house walls.
  • The advantages of shotcrete shoring include smaller equipment to access and do the nails, as typical shoring solution involved large equipment and high costs to build working berms on a hillside lot.

Owners of land that was typically considered unsuitable as building lots can re consider and realize hidden value with permanent soil nail walls constructed by HC Matcon. HCM is a full service Design Build Specialist contractor.

Client: HC Matcon
Location: Toronto, Ontario

Great Lakes Copper Plant

Great Lakes Copper Plant

Great Lakes Copper Plant The Great Lakes Copper Plant in London, Ontario, posed a technical challenge in shotcrete shoring. HC Matcon helped to facilitate the installation of a new copper
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included:
Read More

Odeon Ronmore Development

Odeon Ronmore Development HCM was contracted to provide the design and installation of shoring system for a mixed use commercial development in the main corridor of the Garrison Woods area
Read More

Oshawa Mall

Oshawa Mall The Oshawa Mall expansion was a large project that required several foundation and shoring services. HCM met the needs of the contractor by providing both tied back and
Read More
Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More