Siemens Energy Blade Plant – Phase 2

Siemens Energy Blade Plant – Phase 2

HC Matcon’s project at the Siemens Energy Blade Plant consisted of the design, supply & installation of 70 helical piers within the existing plant location in Tillsonburg, ON.

As the project was located in an existing, active manufacturing facility, extra care had to be taken on the part of HC Matcon to work within the confines of the building space, which included tight egress for our equipment and limited head room clearance (20′+/-).

Safety is always a number one priority, but additional attention had to be paid as the work was being completed within an active plant with live personnel maintaining scheduled productions.

Some unforeseen obstructions were encountered during helical installation, but with quick decision making and our crews efficiency, HC Matcon was able to complete the project on time and on budget.

Client: Grassmere Construction
Location: Tillsonburg, Ontario

Currie Barracks Residential Development

Currie Barracks Residential Development HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever
Read More
Great Lakes Copper Plant

Great Lakes Copper Plant

Great Lakes Copper Plant The Great Lakes Copper Plant in London, Ontario, posed a technical challenge in shotcrete shoring. HC Matcon helped to facilitate the installation of a new copper
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
65 Lillian Street Condominium Building

65 Lillian Street Condominium Building

65 Lillian Street Condominium Building Work on this jobsite included the excavation support system for a new condominium building located on 65 Lillian Street in Toronto, Ontario. HC Matcon used
Read More

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More