Parkside Dr. Slope Stabilization

Parkside Dr. Slope Stabilization

The City of Toronto tendered a slope stabilization project that required the installation of helical piles in the embankment of a failed slope on Parkside Drive in Toronto, Ontario.

HC Matcon was procured to install 39 helical piles using ECP square shaft helicals with a 8-10-12 inch helix configuration in lieu of the equivalent 1.5” square bar (SS150).  Upon HC Matcon’s arrival on site, current ground conditions had changed as the existing slope was unstable and eroded creating a challenging work site.  The slope was found to be 5 degrees steeper than expected and posed a problem to the stability of the excavators and to the installation of the helicals.  HC Matcon stabilized the excavator on the slope to allow for a flexible control for the hydraulic motor to allow the required vertical helical        installation angle under the roadway.  The final problem encountered was the alignment of the helical pile with the hydraulic motor which was resolved with minor adjustments to the equipment.  HC Matcon installed all 39 helicals at their 30 degree inclination to depths ranging between 36 and 45 feet and preloaded all helicals to 90 KN on oversized steel bearing pads.

This project reveals that HC Matcon is able to adapt to develop systems that allow for proper mobility and stability of the installation equipment.  While HC Matcon did start later than scheduled, all problems were overcome and the schedule was still completed on time.  Today, the slope is covered with natural vegetation and is performing as intended.

Client: NEI Construction Corp.

Location: 421 Parkside Dr., Toronto, Ontario

Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion The Government of Alberta and Alberta Health Services (AHS) have broken ground on this project, which will renovate and expand the hospital
Read More

Herald Block

Herald Block HCM was chosen to provide a comprehensive design-build shoring solution for Phase 1 of Brookfield Place development, which will become the tallest building in Western Canada. The excavation
Read More
HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

Sage Condominiums: Phase II The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering
Read More
Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More

Odeon Ronmore Development

Odeon Ronmore Development HCM was contracted to provide the design and installation of shoring system for a mixed use commercial development in the main corridor of the Garrison Woods area
Read More
Milton Grade Separation

Milton Grade Separation

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario
Read More