8 Ida Street

8 Ida Street

HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack of real-estate and property, the home owners decided to build an in ground pool inside of their newly completed residence.  The residence consisted of an existing crawl space in which the pool was requested.  It should be noted that the interior finishes consisted of sensitive glass and marble which were sensitive to movement below.

The project involved deepening the crawl space for the swimming pool addition.  Innovation was required due to a unique underpinning design which included two layers of continuous rebar within the panel in order for it to be used as a permanent foundation wall.  This created constructability issues due to the required three panel sequences of installation.  To allow for unobstructed panel excavation, HC Matcon and RWH, an HC Group company, special bulkhead steel embedments were fabricated from mesh and anchor couplers (provided by Williams Form Engineering) in the HC Matcon shop. These were used in place of rebar to allow for all threading of the bars satisfying the engineer.

The work was successfully completed on time and on budget.  Underpinning systems are a specialty of HC Matcon.

Client: Laureden Inc.

Location: Toronto, Ontario

HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

Sage Condominiums: Phase II The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering
Read More

Sarcee Trail

Sarcee Trail The foundation of an existing residential apartment building in Southwest Calgary was compromised and required remedial measures to be completed. RWH designed a micropile underpinning system based on
Read More
Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More
Credit Valley Hospital

Credit Valley Hospital

Alternative to Save Time and Money The Credit Valley Hospital in Mississauga, Ontario is undergoing a massive expansion and renovation. HC Matcon was brought in to undertake the shoring, underpinning,
Read More
EEEL University of Calgary

EEEL University of Calgary

Zero Ground Loss This project followed shortly after finishing the Taylor Family Digital Library project, which was in close proximity to this site on the same campus. Design considerations for
Read More