8 Ida Street

8 Ida Street

HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack of real-estate and property, the home owners decided to build an in ground pool inside of their newly completed residence.  The residence consisted of an existing crawl space in which the pool was requested.  It should be noted that the interior finishes consisted of sensitive glass and marble which were sensitive to movement below.

The project involved deepening the crawl space for the swimming pool addition.  Innovation was required due to a unique underpinning design which included two layers of continuous rebar within the panel in order for it to be used as a permanent foundation wall.  This created constructability issues due to the required three panel sequences of installation.  To allow for unobstructed panel excavation, HC Matcon and RWH, an HC Group company, special bulkhead steel embedments were fabricated from mesh and anchor couplers (provided by Williams Form Engineering) in the HC Matcon shop. These were used in place of rebar to allow for all threading of the bars satisfying the engineer.

The work was successfully completed on time and on budget.  Underpinning systems are a specialty of HC Matcon.

Client: Laureden Inc.

Location: Toronto, Ontario

Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More

Pixel by Battistella

Pixel by Battistella HCM was contracted to provide the design and installation of shoring system for a 110 unit building consisting of town homes, studios and condos. This development was
Read More

Herald Block

Herald Block HCM was chosen to provide a comprehensive design-build shoring solution for Phase 1 of Brookfield Place development, which will become the tallest building in Western Canada. The excavation
Read More

The Osterberg Cell

The Osterberg Cell HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close
Read More
Wal-Mart Micropiles

Wal-Mart Micropiles

Overcoming Poorly Engineered Fill This project solved a very difficult problem for Buttcon and Walmart Canada, with the new footings settling on a poorly done engineered fill. The previous winter
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More