HCM was chosen to provide a comprehensive design-build shoring solution for Phase 1 of Brookfield Place development, which will become the tallest building in Western Canada. The excavation spanned a city block and extended 22 meters deep. The shoring system, designed by RWH Engineering Inc. (RWH), was comprised of an 11 meter deep perched caisson wall above shotcrete, which continued into the rock for the remaining depth of the excavation. 

The challenges faced on this project included old foundations encountered during drilling, surrounding tightly clustered utilities, vulnerable neighbouring structures, and the adjacent light rail transit (LRT) system. HCM met these challenges with close attention to detail and meticulous planning to prevent any utility conflicts and structural damage. RWH completed the precision monitoring of the shoring and adjacent structures providing weekly reports to all stakeholders for the duration of the project. 

Client: EllisDon Corporation

Location: Calgary, Alberta

HCM was able to use their experience on past projects to design and construct a shoring solution that worked with the varying soil conditions at depth. This solution resulted in a more sustainable project as the perched wall required less material than a traditional full depth caisson wall, and provided project cost and schedule savings. Brookfield Place is an example of the ability of the HC Group to work together and overcome challenges in complex projects.

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More
CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms.
Read More

Silver Creek Solar Farm

Silver Creek Solar Farm For this project, HCM provided installation services to EllisDon for the helical pile foundations for future solar racking. Due to the stringent timelines and project milestones,
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope
Read More
Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general