University of Toronto Faculty of Law

TTC Steels Launch Shaft

The expansion of the Faculty of Law building at the University of Toronto incorporated the addition of another storey to the existing building. The increased loading required an upgrade to the capacity of the building foundation. HCM proposed an innovative solution to install micropiles next to the caissons to accommodate the additional loading. The micropile foundation was designed by RWH Engineering Inc. (RWH), an HCM Group company.

Specialty equipment was required to install the micropiles inside the existing building, as there was only four meters of headroom in some areas. HCM used a low head room drill to install micropiles to depths of 18 meters. The micropile design required triple post-grouting to achieve the necessary bond between the grout and the soil. The soil encountered was comprised of layers of sand, silt, and clay. To confirm the design adhesion, a sacrificial load test was performed to 250% of the ULS load.

This project is an example of how HCM/RWH can offer alternative foundation solutions to meet the needs of any project, including projects with challenging site restrictions.

Client: Eastern Construction

Location: Toronto, Ontario

Currie Barracks Residential Development

Currie Barracks Residential Development HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever
Read More

Silver Creek Solar Farm

Silver Creek Solar Farm For this project, HCM provided installation services to EllisDon for the helical pile foundations for future solar racking. Due to the stringent timelines and project milestones,
Read More

Weston Road

Weston Road The Metrolinx Weston Tunnel project will serve as a below grade rail corridor for the GO Georgetown line linking the airport to downtown Toronto. HCM was subcontracted by
Read More

The Osterberg Cell

The Osterberg Cell HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close
Read More
LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall HC Matcon (HCM) and RWH Engineering (RWH) reacted quickly after being contacted to provide a design-build solution for a slope failure that occurred during
Read More
HC Matcon - Twinning of the West Trunk Sanitary Sewer

Twinning of the West Trunk Sanitary Sewer

Twinning Of The West Trunk Sanitary Sewer This project includes the installation of a deep trunk sanitary sewer within bedrock under Erin Mills Parkway in Mississauga. HCM together with RWH Engineering
Read More