Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs

Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts and storm and sewer pipe in downtown Barrie, Ontario.

  • Helical pile support systems were ideal for use on the project based on the type of soils encountered and the project location related to the nearby lake. Excavation parameters were further impeded by the proximity of streets and roads required to be in operation while the work was in progress. 50 Kip design capacities were achieved on small diameter pipe, (2-7/8) which were installed and torqued as required.
  • The versatility of the installations enabled the Owner to minimize costs by installing only lengths and depths required.
  • Due to the nature and achievable installation production rate it was possible to stay ahead of the concrete work as small areas of work were excavated in sections.

The helical pile supports were utilized on both the Kidd’s Creek project as well as the second phase of the retrofit and expansion located at Toronto and Simcoe Streets in Barrie, Ontario.

Client: Drainstar Contracting Ltd
Location: Barrie, Ontario

Paruk Residence

Paruk Residence

Overcoming Poor Soil-Bearing Capacity The Paruk Residence is a high end two story structure, located at 24 York Valley Crescent in North York, Ontario, just north of the Don River.
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included:
Read More
Mount Royal University Conservatory

Mount Royal University Conservatory

Mount Royal University Conservatory Design considerations for the foundations were similar to previous projects in the area, with installation of approx. 220 cast-in-place belled piles. The project design team for
Read More
HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

Sage Condominiums: Phase II The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering
Read More
Smith Residence

Smith Residence

Toronto’s First Permanent Soil Nail Wall This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in
Read More

Silver Creek Solar Farm

Silver Creek Solar Farm For this project, HCM provided installation services to EllisDon for the helical pile foundations for future solar racking. Due to the stringent timelines and project milestones,
Read More