Cobourg Railway Station

Cobourg Railway Station

On this project, HCM, in conjunction with its in-house engineering company, RWH Engineering Inc. (RWH), was able to offer the owner one source for the design, supply, and installation of a complete temporary shoring system and precision monitoring services. 

RWH produced an efficient design that conformed to AREMA railway standards and resulted in savings to the owner, in comparison to the original tendered drawings. The RWH design included a double pile and lagging system with 17.5 meter long tiebacks, required due to the soft soils. In addition, HCM installed 275 mm diameter permanent micropiles at the base of the shoring. The micropiles extended through 12 meters of soil and were founded 5 meters into bedrock to provide the required capacity. 

The general contractor benefited from working with a single source that could take responsibility for all aspects of the shoring and deep foundations work – guaranteeing quality and reducing costs.

Client: Via Rail Canada Inc.

Location: Cobourg, Ontario

TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More

Twinning Tunnels

Twinning Tunnels The installation of a deep trunk sanitary sewer system in the bedrock beneath Erin Mills Parkway in Mississauga required an innovative approach for shoring manholes. For this project,
Read More

Herald Block

Herald Block HCM was chosen to provide a comprehensive design-build shoring solution for Phase 1 of Brookfield Place development, which will become the tallest building in Western Canada. The excavation
Read More
Great Lakes Copper Plant

Great Lakes Copper Plant

Great Lakes Copper Plant The Great Lakes Copper Plant in London, Ontario, posed a technical challenge in shotcrete shoring. HC Matcon helped to facilitate the installation of a new copper
Read More
St. Thomas Courthouse

St. Thomas Courthouse

Alternate Methods Stop Running Sands HCM was retained to design, supply and install a complete shoring system to facilitate construction of the new St. Thomas Court House for EllisDon. Construction
Read More
EEEL University of Calgary

EEEL University of Calgary

Zero Ground Loss This project followed shortly after finishing the Taylor Family Digital Library project, which was in close proximity to this site on the same campus. Design considerations for
Read More