For this project, HCM provided installation services to EllisDon for the helical pile foundations for future solar racking. Due to the stringent timelines and project milestones, HCM employed a total of four crews on this job to meet the project schedule.

A large challenge that HCM faced on this project was the harsh winter. HCM dedicated an auger mounted excavator on site for the second half of the project to allow for any necessary pre-drilling through the 500 mm thick frost layer. The schedule was maintained despite site shut downs due to below -30 temperatures, as well as site access issues resulting from the inclement weather. 

RWH Engineering Inc. (RWH) provided the field engineering support for the project, which allowed HCM to provide complete pile installation records. 

Client: EllisDon Corporation

Location: Aylmer, Ontario

The teamwork of the HCM crew members in combination with the attention to detail provided by RWH, and the positive team support provided by EllisDon resulted in the project being successfully completed within schedule and budget.

Currie Reservoir - Continuous Caisson Wall

Currie Reservoir – Continuous Caisson Wall

Increased Safety: We Used Horizontal H-Piles This project is a part of a large upgrade to the Currie Reservoir in southwest Calgary, Alberta. The project included the installation of a
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More

Odeon Ronmore Development

Odeon Ronmore Development HCM was contracted to provide the design and installation of shoring system for a mixed use commercial development in the main corridor of the Garrison Woods area
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More
Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More

8 Ida Street

8 Ida Street HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack
Read More