Silver Creek Solar Farm

Silver Creek Solar Farm

For this project, HCM provided installation services to EllisDon for the helical pile foundations for future solar racking. Due to the stringent timelines and project milestones, HCM employed a total of four crews on this job to meet the project schedule.

A large challenge that HCM faced on this project was the harsh winter. HCM dedicated an auger mounted excavator on site for the second half of the project to allow for any necessary pre-drilling through the 500 mm thick frost layer. The schedule was maintained despite site shut downs due to below -30 temperatures, as well as site access issues resulting from the inclement weather. 

RWH Engineering Inc. (RWH) provided the field engineering support for the project, which allowed HCM to provide complete pile installation records. 

Client: EllisDon Corporation

Location: Aylmer, Ontario

The teamwork of the HCM crew members in combination with the attention to detail provided by RWH, and the positive team support provided by EllisDon resulted in the project being successfully completed within schedule and budget.

TTC Patten Building

TTC Patten Building HC Matcon was retained to install micropile foundation for TTC Patten Building on 835 Davenport Road, Toronto. The building was originally designed for storage of paper tickets
Read More
Milton Grade Separation

Milton Grade Separation

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario
Read More
The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More
HC Group - K2 Condominiums

K2 Condominiums

K2 Condominiums This development on King Street in Waterloo required approximately 15,000 SF of shoring for two levels of underground parking. RWH Engineering Inc. (RWH) designed a piles and lagging
Read More

Pixel by Battistella

Pixel by Battistella HCM was contracted to provide the design and installation of shoring system for a 110 unit building consisting of town homes, studios and condos. This development was
Read More

George Street Bridge

George Street Bridge This bridge replacement project required the drilling of two abutments consisting of a total of 32 drilled caissons in the existing creek bed. In addition to the
Read More