Skip to content

Parkside Dr. Slope Stabilization

Parkside Dr. Slope Stabilization

The City of Toronto tendered a slope stabilization project that required the installation of helical piles in the embankment of a failed slope on Parkside Drive in Toronto, Ontario.

HC Matcon was procured to install 39 helical piles using ECP square shaft helicals with a 8-10-12 inch helix configuration in lieu of the equivalent 1.5” square bar (SS150).  Upon HC Matcon’s arrival on site, current ground conditions had changed as the existing slope was unstable and eroded creating a challenging work site.  The slope was found to be 5 degrees steeper than expected and posed a problem to the stability of the excavators and to the installation of the helicals.  HC Matcon stabilized the excavator on the slope to allow for a flexible control for the hydraulic motor to allow the required vertical helical        installation angle under the roadway.  The final problem encountered was the alignment of the helical pile with the hydraulic motor which was resolved with minor adjustments to the equipment.  HC Matcon installed all 39 helicals at their 30 degree inclination to depths ranging between 36 and 45 feet and preloaded all helicals to 90 KN on oversized steel bearing pads.

This project reveals that HC Matcon is able to adapt to develop systems that allow for proper mobility and stability of the installation equipment.  While HC Matcon did start later than scheduled, all problems were overcome and the schedule was still completed on time.  Today, the slope is covered with natural vegetation and is performing as intended.

Client: NEI Construction Corp.

Location: 421 Parkside Dr., Toronto, Ontario

Centron Business Park Retaining Wall

Centron Business Park Retaining Wall

Steep Slope Retaining Wall The site topography presented the developer with the challenging task of constructing a permanent retaining wall structure into a hill formation near Blackfoot Trail in southeast
Read More
Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
Smith Residence

Smith Residence

Toronto’s First Permanent Soil Nail Wall This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in
Read More

Brantford General Hospital

Brantford General Hospital This innovative project represents the first use of shotcrete shoring in place of caisson walls against a building in Ontario. Caisson walls have typically been utilized duw
Read More

Midtown Lofts

Midtown Lofts On this project, HCM in conjunction with RWH Engineering Inc. (RWH), provided the owner with a complete design-build package and precision monitoring services for an 8.5m deep temporary
Read More