Skip to content

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant

This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at the time of tender, HCM proposed the use of shotcrete shoring for the site’s earth retention system. Later, due to an unforeseen influx of water into the excavation from a problematic sand lense and the resulting saturated soil conditions, shotcrete was found to no longer be a suitable solution for the site’s shoring. To address the issue, HCM devised a perched caisson wall system to cut off the flow of groundwater.

As fieldwork progressed, other fill soil conditions were encountered that were different from the geotechnical report issued at the time of tender. A change of the soil conditions, as encountered at Lakeview, would typically impact the project’s schedule because of the need for a redesign of the shoring system. HCM was able to respond with practical solutions to keep the project moving while updating the drawings to represent the design changes.

HCM can overcome most problems or restrictions to produce a final product that is desirable to all parties.

Client: North America Constructors Ltd.

Location: Mississauga, Ontario

Niagara Biosolids Facility - Inside Pit

Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines
Read More

McMaster Nuclear Building

McMaster Nuclear Building The nuclear research building was an upgrade to the existing structure to allow for world class nuclear research for leading nuclear scientists.  This project was funded by
Read More
LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall

LRT Slope Protection at Retaining Wall HC Matcon (HCM) and RWH Engineering (RWH) reacted quickly after being contacted to provide a design-build solution for a slope failure that occurred during
Read More

Twinning Tunnels

Twinning Tunnels The installation of a deep trunk sanitary sewer system in the bedrock beneath Erin Mills Parkway in Mississauga required an innovative approach for shoring manholes. For this project,
Read More

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More
HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

Sage Condominiums: Phase II The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering
Read More