Lakeview Water Treatment Plant

Lakeview Water Treatment Plant

This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at the time of tender, HCM proposed the use of shotcrete shoring for the site’s earth retention system. Later, due to an unforeseen influx of water into the excavation from a problematic sand lense and the resulting saturated soil conditions, shotcrete was found to no longer be a suitable solution for the site’s shoring. To address the issue, HCM devised a perched caisson wall system to cut off the flow of groundwater.

As fieldwork progressed, other fill soil conditions were encountered that were different from the geotechnical report issued at the time of tender. A change of the soil conditions, as encountered at Lakeview, would typically impact the project’s schedule because of the need for a redesign of the shoring system. HCM was able to respond with practical solutions to keep the project moving while updating the drawings to represent the design changes.

HCM can overcome most problems or restrictions to produce a final product that is desirable to all parties.

Client: North America Constructors Ltd.

Location: Mississauga, Ontario

George Street Bridge

George Street Bridge This bridge replacement project required the drilling of two abutments consisting of a total of 32 drilled caissons in the existing creek bed. In addition to the
Read More
Mount Royal University Conservatory

Mount Royal University Conservatory

Mount Royal University Conservatory Design considerations for the foundations were similar to previous projects in the area, with installation of approx. 220 cast-in-place belled piles. The project design team for
Read More
65 Lillian Street Condominium Building

65 Lillian Street Condominium Building

65 Lillian Street Condominium Building Work on this jobsite included the excavation support system for a new condominium building located on 65 Lillian Street in Toronto, Ontario. HC Matcon used
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More

Midtown Lofts

Midtown Lofts On this project, HCM in conjunction with RWH Engineering Inc. (RWH), provided the owner with a complete design-build package and precision monitoring services for an 8.5m deep temporary
Read More
Segmental Excavation Mining and Support of Excavation - Eglinton LRT - Cedarvale Station SEM and SOE

Eglinton LRT – Cedarvale Station SEM and SOE

Eglinton LRT – Cedarvale Station SEM and SOE The Eglinton LRT Cedarvale Station required the new structure to pass below the existing TTC subway below grade. HC Matcon Inc. (HCM)
Read More