This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at the time of tender, HCM proposed the use of shotcrete shoring for the site’s earth retention system. Later, due to an unforeseen influx of water into the excavation from a problematic sand lense and the resulting saturated soil conditions, shotcrete was found to no longer be a suitable solution for the site’s shoring. To address the issue, HCM devised a perched caisson wall system to cut off the flow of groundwater.

As fieldwork progressed, other fill soil conditions were encountered that were different from the geotechnical report issued at the time of tender. A change of the soil conditions, as encountered at Lakeview, would typically impact the project’s schedule because of the need for a redesign of the shoring system. HCM was able to respond with practical solutions to keep the project moving while updating the drawings to represent the design changes.

HCM can overcome most problems or restrictions to produce a final product that is desirable to all parties.

Client: North America Constructors Ltd.

Location: Mississauga, Ontario

HC Matcon - Twinning of the West Trunk Sanitary Sewer

Twinning of the West Trunk Sanitary Sewer

Twinning Of The West Trunk Sanitary Sewer This project includes the installation of a deep trunk sanitary sewer within bedrock under Erin Mills Parkway in Mississauga. HCM together with RWH Engineering
Read More

McMaster Nuclear Building

McMaster Nuclear Building The nuclear research building was an upgrade to the existing structure to allow for world class nuclear research for leading nuclear scientists.  This project was funded by
Read More
Centron Business Park Retaining Wall

Centron Business Park Retaining Wall

Steep Slope Retaining Wall The site topography presented the developer with the challenging task of constructing a permanent retaining wall structure into a hill formation near Blackfoot Trail in southeast
Read More
Mars B Toronto General Hospital

Mars B Toronto General Hospital

This 3.5 Million dollar contract involved HC Matcon providing a full excavation, a 16,000 Sq. Ft. shoring and large diameter caisson package for this project. Challenges included the support of
Read More
Upper House Condominiums - Caisson Wall Piles and Lagging

Upper House Condominiums

Upper House Condominiums HCM completed the shoring for the eight storey Upper House Condominium project which required a 12m deep excavation for two levels of underground parking. A tied-back shoring
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal