University of Ottawa STEM Complex

University of Ottawa STEM Complex

HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh Ottawa winter, HCM deployed double crews, 24 hours a day for both vertical drilling and anchor installation. Constant adaptation to the soil conditions was needed due to the presence of soft clays, cobbley till, and flowing sands. Multiple freeze-thaw cycles made for challenging site conditions requiring proficient site communication to ensure a productive and safe jobsite. RWH Engineering Inc. produced an efficient shoring solution and by self-performing the precision monitoring allowed for the design to be verified closely with the excavation procedures. In-house engineering support also ensured there was no downtime caused by unforeseen conditions or site issues.

HCM worked alongside the other contractors to expedite the project to the bottom of the 17 meter deep site in 3 months.

Location: Ottawa, Ontario

Customer: R.W. Tomlinson Ltd

TTC St. Clair Station

TTC St. Clair Station

Overcoming Tight Access and High Water Table Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More
EEEL University of Calgary

EEEL University of Calgary

Zero Ground Loss This project followed shortly after finishing the Taylor Family Digital Library project, which was in close proximity to this site on the same campus. Design considerations for
Read More

The Osterberg Cell

The Osterberg Cell HCM was contracted to provide supply & installation of O-Cell load test on the New Calgary Library project located in downtown core of the city, in close
Read More
Upper House Condominiums - Caisson Wall Piles and Lagging

Upper House Condominiums

Upper House Condominiums HCM completed the shoring for the eight storey Upper House Condominium project which required a 12m deep excavation for two levels of underground parking. A tied-back shoring
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope
Read More