Twinning Tunnels

Twinning Tunnels

The installation of a deep trunk sanitary sewer system in the bedrock beneath Erin Mills Parkway in Mississauga required an innovative approach for shoring manholes. For this project, HCM was contracted to install nine caisson wall compression rings at various locations. RWH Engineering Inc. (RWH), an HC Group company, provided an economical design for the shafts which had diameters of up to 11 meters and depths up to 50 meters.

RWH overcame several design challenges on this project including the consideration of the compression rings to withstand large uneven surcharges due to a close embankment as well as significant crane loads. To ensure the integrity of the shoring system, RWH provided the precision monitoring services.

This project required the installation of the compression rings into the bedrock to support the overburden. HCM successfully implemented RWH’s innovative design which did not include a bench at the top of the bedrock, as commonly seen in compression ring design. This resulted in a reduced diameter of the compression rings, significantly reducing the amount of bulk excavation required as well as installation time.

The project exemplifies HCM’s ability to find effective solutions to complex projects to minimize construction time.

Location: Mississauga, Ontario

Customer: McNally Construction Inc.

Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More

George Street Bridge

George Street Bridge This bridge replacement project required the drilling of two abutments consisting of a total of 32 drilled caissons in the existing creek bed. In addition to the
Read More
HCM Group - Sage Condominiums: Phase II

Sage Condominiums: Phase II

Sage Condominiums: Phase II The construction of the new Sage Condominium required a shoring system that could facilitate the 10 meter foundation depth while working within encroachment restrictions. RWH Engineering
Read More
Love Condos

Love Condos

Love Condos This project involved approx 41,000 sf of piles and lagging temporary shoring system. The project was broken into two phase both consisting of piles and lagging with both
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More

Midtown Lofts

Midtown Lofts On this project, HCM in conjunction with RWH Engineering Inc. (RWH), provided the owner with a complete design-build package and precision monitoring services for an 8.5m deep temporary
Read More