The Telus Sky tower will be the 3rd tallest building in Calgary with the deepest basement excavation in western Canada. HCM Group took on the challenge of creating a shoring system suitable for the 30m excavation. RWH designed the shoring system with an 11m deep perched secant wall and shotcrete was used in the bedrock to stabilize the rest of the excavation. HCM contractors were responsible for the installation of the perched secant wall and the shotcrete.

The project was not without its challenges. These challenges included neighboring structures, the LRT system that ran adjacent to the site, existing Telus utilities and limited working space within the excavation. An extremely sensitive Telus duct bank ran adjacent to the excavation and the movement of the bank had to be kept to a minimum. RWH had to take this into consideration when designing the wall. The footprint of the excavation was only 2,100m2. HCM contractors were able to work strategically with other sub-contractors to ensure work could be carried out seamlessly in the small area. RWH provided precision monitoring of the shoring, neighboring structures and the LRT line. Monitoring reports were provided twice a week until the excavation reached sound bedrock and it was then reduced to weekly.

HCM Group were able to use their experience with similar past projects to design and construct a shoring system that was suitable for the 30m excavation. The shoring moved 75% of what was originally predicted, proving it was more than adequate.

Client: Icon West Construction

Location: Calgary, Alberta

HC Group - Telus Sky Shoring Clean Wall
Telus Sky tower - HC Matcon
Telus Sky tower - HC Matcon
Telus Sky tower - HC Matcon

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More

TTC Patten Building

TTC Patten Building HC Matcon was retained to install micropile foundation for TTC Patten Building on 835 Davenport Road, Toronto. The building was originally designed for storage of paper tickets
Read More

Talbot Street

Talbot Street HCM completed the design-build shoring for the Azure condominium project in downtown London. Due to the soil conditions encountered during initial drilling, a full depth caisson wall was
Read More
Kidd's Creek Culvert Restoration

Kidd’s Creek Culvert Restoration

Versatile Installations Minimized Costs Work on the Kidd’s Creek Culvert Restoration project involved the supply and installation of 600 plus helical pile supports for new catch basins, man holes, culverts
Read More
Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included: