Eglinton LRT – Cedarvale Station SEM and SOE

Eglinton LRT – Cedarvale Station SEM and SOE

The Eglinton LRT Cedarvale Station required the new structure to pass below the existing TTC subway below grade. HC Matcon Inc. (HCM) was contracted by the Crosslinx group to perform segmental excavation method (SEM) and support of excavation (SOE) below the existing subway tunnel. HCM performed the detailed excavation and the installation of dry mix shotcrete in 6 galleries for the phased installation of structural needle beams to support the tunnel above.
HCM’s SEM work involved excavation in 1.1m sections, installation and stressing of temporary supports, and installation of accelerated fibre-reinforced dry mix shotcrete for the walls and base slab. Due to strict movement tolerances of the tunnel above, a unique prestressed waler incorporated with shotcrete shoring was implemented. Special design and constructability considerations were coordinated with the designer to ensure safety during excavation. HCM installed a waler and tie-rod system that was prestressed from between the walers to achieve the deformed shape required by designers.
Due to HCM’s knowledge and experience with shotcrete and associated applications,
this unique project was executed successfully and to the satisfaction of the project
team.

Location: Toronto, ON 

Customer: SKYGRiD Construction Inc.

Segmental Excavation Mining and Support of Excavation - Eglinton LRT - Cedarvale Station SEM and SOE
Segmental Excavation Mining and Support of Excavation - Eglinton LRT - Cedarvale Station SEM and SOE
Segmental Excavation Mining and Support of Excavation - Eglinton LRT - Cedarvale Station SEM and SOE
Smith Residence

Smith Residence

Toronto’s First Permanent Soil Nail Wall This project involved a hillside lot and a high end home in Toronto. The installation was the first permanent soil nail wall used in
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More
Love Condos

Love Condos

Love Condos This project involved approx 41,000 sf of piles and lagging temporary shoring system. The project was broken into two phase both consisting of piles and lagging with both
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included:
Read More

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at
Read More
St. Joseph's Health Centre Parking

St. Joseph’s Health Centre Parking

Shotcrete Reduces Costs for Owner The St. Joseph’s Health Centre is adding a new Our Lady of Mercy wing complete with three levels of underground parking. HC Matcon was responsible
Read More