Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion

The Government of Alberta and Alberta Health Services (AHS) have broken ground on this project, which will renovate and expand the hospital to improve patient services and reduce wait times. When complete, the $200-million redevelopment will expand available ambulatory care space and will allow more space for the emergency department, surgical suite, maternal/child care, and include a rooftop helipad.

HCM Contractors Inc. was successful with its’ proposal that included 100 Belled Caissons at depths up to 100 feet, 7000 ft2 of caisson wall, and the underpinning of 7 major columns to support the additional load imposed by the new structure. The underpinning is particularly challenging because much of the work is to be completed inside of an operational hospital with limited access and noise and vibration concerns. HCM employed a unique method of transferring the load from the column footings to the micro piles that ensured a good bond and efficient design.

This project comes on the heels of the newly constructed MHRH Energy Centre, another successfully completed project by HCM in the fall of 2012.

Client: Stuart Olson Dominion Ltd.
Location: Medicine Hat, Alberta

Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More
Niagara Biosolids Facility - Inside Pit

Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines
Read More
St. Thomas Courthouse

St. Thomas Courthouse

Alternate Methods Stop Running Sands HCM was retained to design, supply and install a complete shoring system to facilitate construction of the new St. Thomas Court House for EllisDon. Construction
Read More

Mapleview Drive

Mapleview Drive The expansion of Mapleview Drive in Barrie required track protection for an existing railway overpass. HCM was retained to install a strutted piles and lagging shoring system. RWH
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting
Read More