This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal water infiltration, an important feature in the high density area of downtown.  HCM was able to call upon experience from similar successful past projects, such as the installation of a tied-back continuous caisson wall for the new Mustard Seed Building on Tenth Avenue and Centre Street S.E., to ensure a successful project.

The system was designed for a maximum excavation of approximately 8.5 meters below grade at the north portion of the site and 10 meters below grade at the south portion of the site.  This resulted in an approximate total area of 13,100 square feet of shoring required.

This project is another example of HCM’s ability to work with a General Contractor to execute a successful shoring project with a tight schedule and budget.

Client: Ledcor Construction Ltd.

Location: Calgary, Alberta

Currie Barracks Residential Development

Currie Barracks Residential Development HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever
Read More
Grand House

Grand House

Difficult But Not Impossible The Grand House is a student designed and constructed co-operative housing project located in Cambridge, Ontario.  It has won awards and is a landmark building. Due
Read More

Lakeview Water Treatment Plant

Lakeview Water Treatment Plant This project was part of the second phase of an expansion program to the region of Peel’s Lakeview Water Treatment Plant. Given the information provided at
Read More

Sarcee Trail

Sarcee Trail The foundation of an existing residential apartment building in Southwest Calgary was compromised and required remedial measures to be completed. RWH designed a micropile underpinning system based on
Read More

Spray River Bridge

Spray River Bridge During the 2013 flooding in Southern Alberta, the Spray River undermined the foundation of a 24m long all season bridge causing the bridge to collapse.   As
Read More
Weston Tunnel Grade Separation

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation HC Matcon achieved a significant milestone on the Weston Tunnel project, allowing for the GC to accelerate the schedule and make up for project delays. HCM