This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal water infiltration, an important feature in the high density area of downtown.  HCM was able to call upon experience from similar successful past projects, such as the installation of a tied-back continuous caisson wall for the new Mustard Seed Building on Tenth Avenue and Centre Street S.E., to ensure a successful project.

The system was designed for a maximum excavation of approximately 8.5 meters below grade at the north portion of the site and 10 meters below grade at the south portion of the site.  This resulted in an approximate total area of 13,100 square feet of shoring required.

This project is another example of HCM’s ability to work with a General Contractor to execute a successful shoring project with a tight schedule and budget.

Client: Ledcor Construction Ltd.

Location: Calgary, Alberta

Oshawa Mall

Oshawa Mall The Oshawa Mall expansion was a large project that required several foundation and shoring services. HCM met the needs of the contractor by providing both tied back and
Read More
Niagara Biosolids Facility - Inside Pit

Niagara Biosolids Facility – Inside Pit

A Shotcrete Solution to a Difficult Problem Work to the existing Biosolids Facility required the installation of deep pits and foundations for proposed processing equipment. Due to the tight confines
Read More

Weston Road

Weston Road The Metrolinx Weston Tunnel project will serve as a below grade rail corridor for the GO Georgetown line linking the airport to downtown Toronto. HCM was subcontracted by
Read More
Mount Royal University Conservatory

Mount Royal University Conservatory

Mount Royal University Conservatory Design considerations for the foundations were similar to previous projects in the area, with installation of approx. 220 cast-in-place belled piles. The project design team for
Read More

George Street Bridge

George Street Bridge This bridge replacement project required the drilling of two abutments consisting of a total of 32 drilled caissons in the existing creek bed. In addition to the
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included: