HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack of real-estate and property, the home owners decided to build an in ground pool inside of their newly completed residence.  The residence consisted of an existing crawl space in which the pool was requested.  It should be noted that the interior finishes consisted of sensitive glass and marble which were sensitive to movement below.

The project involved deepening the crawl space for the swimming pool addition.  Innovation was required due to a unique underpinning design which included two layers of continuous rebar within the panel in order for it to be used as a permanent foundation wall.  This created constructability issues due to the required three panel sequences of installation.  To allow for unobstructed panel excavation, HC Matcon and RWH, an HC Group company, special bulkhead steel embedments were fabricated from mesh and anchor couplers (provided by Williams Form Engineering) in the HC Matcon shop. These were used in place of rebar to allow for all threading of the bars satisfying the engineer.

The work was successfully completed on time and on budget.  Underpinning systems are a specialty of HC Matcon.

Client: Laureden Inc.

Location: Toronto, Ontario

Canada Post Micropiles

Canada Post Micropiles

No Emissions, No Problem The Canada Post McKnight Mail Processing Centre Expansion project involved the installation of micropiles to support a renovation within the facility in northeast Calgary, Alberta. As
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More
Graham Residence

Graham Residence

 Residential Shoring: Complex Design Requires Innovation A retaining wall was required to accommodate the architectural design for a private residence. The site topography presented the General Contractor (Builder) with the
Read More

Burke Residence

Burke Residence The site topography presented the challenging task of installing shoring on steep slopes which impeded the accessibility of conventional equipment to the residential lot at the back alley
Read More

Mapleview Drive

Mapleview Drive The expansion of Mapleview Drive in Barrie required track protection for an existing railway overpass. HCM was retained to install a strutted piles and lagging shoring system. RWH
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope