TTC Steels Launch Shaft

TTC Steels Launch Shaft

The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general contractor: self-performing the shoring, excavation, dewatering, and precision monitoring of the shoring system.

The shaft was 20 meters in depth and required removal of 20,000 cubic meters of material. RWH Engineering Inc. (RWH), an HC Group company, working together with T.H. O’Rourke Engineering, designed a three level strutted system of 460mm – 610mm diameter pre-loaded struts to brace the shoring walls. This design made the shoring system more durable as necessitated by the project due to the extended exposure to heat, cold and frost penetration as the excavated area was to remain open for a minimum of two years. The shoring was initially designed as piles and lagging with a portion of caisson wall, but was redesigned by RWH to a complete caisson wall as a result of these factors. RWH completed all monitoring which involved inclinometers, strain gauges, total stations, and piezometers. Final movement of the shaft showed less than 0.5% of the height. This project shows how HCM and RWH can perform a combination of construction activities, and provide the additional benefit of engineering and precision monitoring services, saving owners money while providing a safe shoring solution.

Client: Toronto Transit Commission

Location: North York, Ontario

Telus Sky tower - HC Matcon

Telus Sky tower

Telus Sky tower The Telus Sky tower will be the 3rd tallest building in Calgary with the deepest basement excavation in western Canada. HCM Group took on the challenge of
Read More

University of Ottawa STEM Complex

University of Ottawa STEM Complex HCM installed a 36,000 SF shoring system for the new STEM Complex at the University of Ottawa. To reduce the shoring schedule during the harsh
Read More

McMaster Nuclear Building

McMaster Nuclear Building The nuclear research building was an upgrade to the existing structure to allow for world class nuclear research for leading nuclear scientists.  This project was funded by
Read More
Upper House Condominiums - Caisson Wall Piles and Lagging

Upper House Condominiums

Upper House Condominiums HCM completed the shoring for the eight storey Upper House Condominium project which required a 12m deep excavation for two levels of underground parking. A tied-back shoring
Read More
Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More

Currie Barracks Residential Development

Currie Barracks Residential Development HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever
Read More