TTC Steels Launch Shaft

TTC Steels Launch Shaft

The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general contractor: self-performing the shoring, excavation, dewatering, and precision monitoring of the shoring system.

The shaft was 20 meters in depth and required removal of 20,000 cubic meters of material. RWH Engineering Inc. (RWH), an HC Group company, working together with T.H. O’Rourke Engineering, designed a three level strutted system of 460mm – 610mm diameter pre-loaded struts to brace the shoring walls. This design made the shoring system more durable as necessitated by the project due to the extended exposure to heat, cold and frost penetration as the excavated area was to remain open for a minimum of two years. The shoring was initially designed as piles and lagging with a portion of caisson wall, but was redesigned by RWH to a complete caisson wall as a result of these factors. RWH completed all monitoring which involved inclinometers, strain gauges, total stations, and piezometers. Final movement of the shaft showed less than 0.5% of the height. This project shows how HCM and RWH can perform a combination of construction activities, and provide the additional benefit of engineering and precision monitoring services, saving owners money while providing a safe shoring solution.

Client: Toronto Transit Commission

Location: North York, Ontario

Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion

Medicine Hat Regional Hospital – New Tower Expansion The Government of Alberta and Alberta Health Services (AHS) have broken ground on this project, which will renovate and expand the hospital
Read More

Currie Barracks Residential Development

Currie Barracks Residential Development HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever
Read More

Cobourg Railway Station

Cobourg Railway Station On this project, HCM, in conjunction with its in-house engineering company, RWH Engineering Inc. (RWH), was able to offer the owner one source for the design, supply,
Read More
Mount Royal University Conservatory

Mount Royal University Conservatory

Mount Royal University Conservatory Design considerations for the foundations were similar to previous projects in the area, with installation of approx. 220 cast-in-place belled piles. The project design team for
Read More
Paruk Residence

Paruk Residence

Overcoming Poor Soil-Bearing Capacity The Paruk Residence is a high end two story structure, located at 24 York Valley Crescent in North York, Ontario, just north of the Don River.
Read More

144 Park Street

144 Park Street During the bidding process, HCM proposed an innovative design-build shoring solution for the 144 Park Street project, a 19 storey condominium in the downtown core of Waterloo.
Read More