TTC Steels Launch Shaft

TTC Steels Launch Shaft

The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general contractor: self-performing the shoring, excavation, dewatering, and precision monitoring of the shoring system.

The shaft was 20 meters in depth and required removal of 20,000 cubic meters of material. RWH Engineering Inc. (RWH), an HC Group company, working together with T.H. O’Rourke Engineering, designed a three level strutted system of 460mm – 610mm diameter pre-loaded struts to brace the shoring walls. This design made the shoring system more durable as necessitated by the project due to the extended exposure to heat, cold and frost penetration as the excavated area was to remain open for a minimum of two years. The shoring was initially designed as piles and lagging with a portion of caisson wall, but was redesigned by RWH to a complete caisson wall as a result of these factors. RWH completed all monitoring which involved inclinometers, strain gauges, total stations, and piezometers. Final movement of the shaft showed less than 0.5% of the height. This project shows how HCM and RWH can perform a combination of construction activities, and provide the additional benefit of engineering and precision monitoring services, saving owners money while providing a safe shoring solution.

Client: Toronto Transit Commission

Location: North York, Ontario

Burke Residence

Burke Residence The site topography presented the challenging task of installing shoring on steep slopes which impeded the accessibility of conventional equipment to the residential lot at the back alley
Read More
Mill Pond Estates

Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg. The project was completed during winter months with
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More
Scarborough Hospital

Scarborough Hospital

A Design-Build Solution The Scarborough Hospital was adding a new Critical Care Centre in the courtyard surrounded on all sides by existing hospital structures.  HC Matcon’s scope of work included:
Read More
St. Joseph's Health Centre Parking

St. Joseph’s Health Centre Parking

Shotcrete Reduces Costs for Owner The St. Joseph’s Health Centre is adding a new Our Lady of Mercy wing complete with three levels of underground parking. HC Matcon was responsible
Read More
65 Lillian Street Condominium Building

65 Lillian Street Condominium Building

65 Lillian Street Condominium Building Work on this jobsite included the excavation support system for a new condominium building located on 65 Lillian Street in Toronto, Ontario. HC Matcon used
Read More