TTC Steels Launch Shaft

The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general contractor: self-performing the shoring, excavation, dewatering, and precision monitoring of the shoring system.

The shaft was 20 meters in depth and required removal of 20,000 cubic meters of material. RWH Engineering Inc. (RWH), an HC Group company, working together with T.H. O’Rourke Engineering, designed a three level strutted system of 460mm – 610mm diameter pre-loaded struts to brace the shoring walls. This design made the shoring system more durable as necessitated by the project due to the extended exposure to heat, cold and frost penetration as the excavated area was to remain open for a minimum of two years. The shoring was initially designed as piles and lagging with a portion of caisson wall, but was redesigned by RWH to a complete caisson wall as a result of these factors. RWH completed all monitoring which involved inclinometers, strain gauges, total stations, and piezometers. Final movement of the shaft showed less than 0.5% of the height. This project shows how HCM and RWH can perform a combination of construction activities, and provide the additional benefit of engineering and precision monitoring services, saving owners money while providing a safe shoring solution.

Client: Toronto Transit Commission

Location: North York, Ontario

Aldershot GO Station Improvements

Aldershot GO Station Improvements

Our Innovative Solution Saves Time Work at the Aldershot Go Station in Burlington, Ontario comprised of the construction of two new pedestrian tunnels to access the existing passenger platforms. The
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More
TTC St. Clair Station

TTC St. Clair Station

Overcoming Tight Access and High Water Table Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During
Read More

8 Ida Street

8 Ida Street HC Matcon was retained to install panel underpinning for a custom home built by Laureden Inc. in 2007 in one of Markham’s prestigious neighbourhoods.  Due to lack
Read More
TTC St. Clair Station

TTC St. Clair Station

Two new elevators on the east and west sides of St. Clair station were installed to allow easier access for disabled persons. During construction, HC Matcon was confronted withsome interesting