TTC Steels Launch Shaft

The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general contractor: self-performing the shoring, excavation, dewatering, and precision monitoring of the shoring system.

The shaft was 20 meters in depth and required removal of 20,000 cubic meters of material. RWH Engineering Inc. (RWH), an HC Group company, working together with T.H. O’Rourke Engineering, designed a three level strutted system of 460mm – 610mm diameter pre-loaded struts to brace the shoring walls. This design made the shoring system more durable as necessitated by the project due to the extended exposure to heat, cold and frost penetration as the excavated area was to remain open for a minimum of two years. The shoring was initially designed as piles and lagging with a portion of caisson wall, but was redesigned by RWH to a complete caisson wall as a result of these factors. RWH completed all monitoring which involved inclinometers, strain gauges, total stations, and piezometers. Final movement of the shaft showed less than 0.5% of the height. This project shows how HCM and RWH can perform a combination of construction activities, and provide the additional benefit of engineering and precision monitoring services, saving owners money while providing a safe shoring solution.

Client: Toronto Transit Commission

Location: North York, Ontario

St. Thomas Courthouse

St. Thomas Courthouse

Alternate Methods Stop Running Sands HCM was retained to design, supply and install a complete shoring system to facilitate construction of the new St. Thomas Court House for EllisDon. Construction
Read More
CN Malton GO Station

CN Malton GO Station

Challenge: Build While Trains Are Running Work on the Malton GO Station in Toronto, Ontario includes improvements such as new walkways and a tunnel for pedestrian access to new platforms.
Read More
London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and
Read More
Dufferin Mall

Dufferin Mall

Dufferin Mall Pedestrian Tunnel This renovation project includes the challenge of constructing a 10ft wide by 12ft deep pedestrian tunnel inside an active mall. HCM together with RWH Engineering proposed
Read More
The Bow

The Bow

The future Bow building, located in Calgary, Alberta Canada, is an innovation in both architectural and shoring design. At 58 stories and with a footprint of two city blocks, The
Read More

BRT Tomken Station

BRT Tomken Station The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive. HCM’s scope
Read More