St. Joseph’s Health Centre Parking

Shotcrete Reduces Costs for Owner

The St. Joseph’s Health Centre is adding a new Our Lady of Mercy wing complete with three levels of underground parking.

HC Matcon was responsible for:

  •  installing the approximately 20,000 square feet of zero clearance shotcrete and caisson wall to be used as a back form for the foundation walls.
  • 121 caissons to support the foundation perimeter and new ambulance bay canopy drilled with a Watson 3110.

HC Matcon’s alternative shotcrete shoring solution added value to the project with a substantial cost savings to the owner.

Client: Harbridge and Cross
Location: Toronto, Ontario

Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More

144 Park Street

144 Park Street During the bidding process, HCM proposed an innovative design-build shoring solution for the 144 Park Street project, a 19 storey condominium in the downtown core of Waterloo.
Read More

Oshawa Mall

Oshawa Mall The Oshawa Mall expansion was a large project that required several foundation and shoring services. HCM met the needs of the contractor by providing both tied back and
Read More

University of Toronto Faculty of Law

TTC Steels Launch Shaft The expansion of the Faculty of Law building at the University of Toronto incorporated the addition of another storey to the existing building. The increased loading
Read More
Bluwater Condominiums

Bluwater Condominiums

The Pemberton Group is adding the luxury waterfront Bluwater Condominiums to its portfolio. The 22,000 SF area of shoring area will accommodate the construction of three eight-story buildings on the
Read More
Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More