TTC Steels Launch Shaft

The expansion of the Faculty of Law building at the University of Toronto incorporated the addition of another storey to the existing building. The increased loading required an upgrade to the capacity of the building foundation. HCM proposed an innovative solution to install micropiles next to the caissons to accommodate the additional loading. The micropile foundation was designed by RWH Engineering Inc. (RWH), an HC Group company.

Specialty equipment was required to install the micropiles inside the existing building, as there was only four meters of headroom in some areas. HCM used a low head room drill to install micropiles to depths of 18 meters. The micropile design required triple post-grouting to achieve the necessary bond between the grout and the soil. The soil encountered was comprised of layers of sand, silt, and clay. To confirm the design adhesion, a sacrificial load test was performed to 250% of the ULS load.

This project is an example of how HCM/RWH can offer alternative foundation solutions to meet the needs of any project, including projects with challenging site restrictions.

Client: Eastern Construction

Location: Toronto, Ontario

Currie Reservoir

Currie Reservoir

Horizontal Underpinning This project consisted of an interlocking secant pile wall, combined with horizontal underpinning to accommodate a new connection to a pump house at the Currie reservoir in Calgary.
Read More

TTC Steels Launch Shaft

TTC Steels Launch Shaft The TTC tendered the Steeles Launch Shaft project as part of the much needed Shepherd subway extension into Vaughan. HCM undertook this project as a general
Read More
Slope Remediation

Slope Remediation

Slope Remediation HCM and RWH Engineering provided a design build solution to remediate a failing slope at a project located in Western Ontario. Prior to HCM’s involvement, the site was excavated 7m into a
Read More
Mars B Toronto General Hospital

Mars B Toronto General Hospital

This 3.5 Million dollar contract involved HC Matcon providing a full excavation, a 16,000 Sq. Ft. shoring and large diameter caisson package for this project. Challenges included the support of
Read More

Cobourg Railway Station

Cobourg Railway Station On this project, HCM, in conjunction with its in-house engineering company, RWH Engineering Inc. (RWH), was able to offer the owner one source for the design, supply,
Read More

Maxwell Bates

Maxwell Bates This project, located on Fourth Street in the downtown core of Calgary, consisted of a tied-back continuous caisson wall.  The caisson wall provided zero ground loss and minimal
Read More