BRT Tomken Station

BRT Tomken Station

The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive.

HCM’s scope of work for this project included all shoring and caisson work to accomodate the construction of transit stations, bridge underpasses and overpasses, and below grade roadways. HCM’s tender submission used shotcrete for roadway protection systems and two-sided shoring for bridge underpass/overpass construction. This unique design, completed by RWH Engineering Inc. (RWH), an HC Group company, resulted in many cost and schedule savings for the owner.

There were numerous jobsites that HCM coordinated during different stages of the project schedule which made communication between the HCM team, the GC and other sub trades critical. This project exemplifies the ability of HCM to assist owners and GCs in finding beneficial solutions for all parties.

Client: Metrolinx

Location: Mississauga, Ontario

London Mental Health

London Mental Health

London Mental Health – Structural Shotcrete HC Matcon completed a 1,650ft2 structural shotcrete wall in just two days of shooting concrete. The wall had a depth of 0.450m thickness and
Read More
Mill Pond Estates

Mill Pond Estates

Shotcrete: Low Cost and Overcoming Hillside Access Issues This 12,000 sq. ft. project involved temporary hillside shoring for a developer in Tillsonburg. The project was completed during winter months with
Read More

Currie Barracks Residential Development

Currie Barracks Residential Development HCM was contracted to provide the design and installation of shoring system for a multi-family condo development in the Currie Barracks area SW Calgary. Conventional cantilever
Read More
Milton Grade Separation

Milton Grade Separation

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario
Read More

Alloa Feedermain

Alloa Feedermain This project involved installation of 3 watertight caisson wall shafts. Two rectangular secant pile wall shaft approx 12m deep and one 6m diameter compression ring shaft approx 7m
Read More
The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal