Skip to content

BRT Tomken Station

BRT Tomken Station

The Mississauga Bus Rapid Transit (BRT) project is a dedicated roadway for bus travel. It stretches 18 km from Winston Churchill Boulevard to Renforth Drive.

HCM’s scope of work for this project included all shoring and caisson work to accomodate the construction of transit stations, bridge underpasses and overpasses, and below grade roadways. HCM’s tender submission used shotcrete for roadway protection systems and two-sided shoring for bridge underpass/overpass construction. This unique design, completed by RWH Engineering Inc. (RWH), an HC Group company, resulted in many cost and schedule savings for the owner.

There were numerous jobsites that HCM coordinated during different stages of the project schedule which made communication between the HCM team, the GC and other sub trades critical. This project exemplifies the ability of HCM to assist owners and GCs in finding beneficial solutions for all parties.

Client: Metrolinx

Location: Mississauga, Ontario

Currie Reservoir - Continuous Caisson Wall

Currie Reservoir – Continuous Caisson Wall

Increased Safety: We Used Horizontal H-Piles This project is a part of a large upgrade to the Currie Reservoir in southwest Calgary, Alberta. The project included the installation of a
Read More
Mount Royal University Conservatory

Mount Royal University Conservatory

Mount Royal University Conservatory Design considerations for the foundations were similar to previous projects in the area, with installation of approx. 220 cast-in-place belled piles. The project design team for
Read More

George Street Bridge

George Street Bridge This bridge replacement project required the drilling of two abutments consisting of a total of 32 drilled caissons in the existing creek bed. In addition to the
Read More
TTC Wilson Complex Modification

TTC Wilson Complex Modification

Engineering Solutions The Toronto Transit Commission will be purchasing all new subway cars in the near future, creating the requirement of larger maintenance carhouses. The original contract drawings employed caisson
Read More
Love Condos

Love Condos

Love Condos This project involved approx 41,000 sf of piles and lagging temporary shoring system. The project was broken into two phase both consisting of piles and lagging with both
Read More
Milton Grade Separation

Milton Grade Separation

Milton Grade Separation Client: BOT Construction Location: Milton, Ontario
Read More