Brantford General Hospital

Brantford General Hospital

This innovative project represents the first use of shotcrete shoring in place of caisson walls against a building in Ontario. Caisson walls have typically been utilized duw to low movements from the inherent stiffness of the shoring wall. Soldier Piles and lagging walls may move up to 25 mm if properly designed, while caisson walls will move as little as 4-6mm. The soil was a poorly graded medium grained sand which required special measures, including vertical mini piles for vertical load restraint and face savings (avoid ground loss). A significant savings to the General Contractor resulted and the project was a technicall success, in that the maximum inclinometer movement was 4mm. This 4mm achievement signals a new opportunity for owners and General Contractors as the shotcrete shoring space savings and costs saving is very real. 

This project supported an 8 storey hospital, with critical operating rooms, and the shotcrete shoring solution provided a vibration free installation with no structural damages to the owner’s hospital.

Location: Brantford, Ontario

Customer: Bondfield Construction Company

 

The Fuse at Evolution

The Fuse at Evolution

The Fuse at Evolution Following years of planning by the City of Calgary, construction on the anticipated East Village Development has started. The proud owners of the first land deal
Read More
Currie Reservoir - Continuous Caisson Wall

Currie Reservoir – Continuous Caisson Wall

Increased Safety: We Used Horizontal H-Piles This project is a part of a large upgrade to the Currie Reservoir in southwest Calgary, Alberta. The project included the installation of a
Read More

144 Park Street

144 Park Street During the bidding process, HCM proposed an innovative design-build shoring solution for the 144 Park Street project, a 19 storey condominium in the downtown core of Waterloo.
Read More
Guelph Civic Administration Complex

Guelph Civic Administration Complex

Complex Shoring Requires Innovative Design Work on this site involved the supply and installation of caissons, underpinning, rock anchors, as well as both traditional soldier pile and lagging and shotcrete
Read More

Dufferin Jog Elimination

Dufferin Jog Elimination This project involved the extension of Duffering Street under an existing CN rail line and through the abutment wall of a century old CN bridge at Queen
Read More
Weston Tunnel Grade Separation

Weston Tunnel Grade Separation

Weston Tunnel Grade Separation HC Matcon achieved a significant milestone on the Weston Tunnel project, allowing for the GC to accelerate the schedule and make up for project delays. HCM
Read More